Solution : https://service.sap.com/sap/support/notes/441102 (SAP Service marketplace login required)
Summary :
This SAP Note acts as an umbrella for various consulting hints related to Production Planning and Detailed Scheduling (PP/DS). It categorizes numerous individual notes into different segments of functionality, offering specific guidance for each noted issue. Key topics covered include guidelines for searching APO-PPS notes, layout tips for product overview, archiving action handlers, and more specific areas such as planned order conversion and scrap documentation in APO and R/3. This compilation helps streamline user approaches to common issues in PP/DS and aids in utilizing SAP’s capabilities more efficiently.
Key words :
production planning run note 518556 groff reorder procedure/part period balancing note 538201 apo, negative relationships note 549205 processor-based setup logic note 645719 production planning run, pp/ds detailed planning note 392712 snp - pp/ds integration, changed note 582545 ineffective decision step note 584657 empty fields, snp-pp/ds conversion - detailed logging note 893458 capable-, order display note 982385 detailed scheduling planning board time zone, optimization note 532979 snp - pp/ds integration snp orders, /sapapo/ppt_rethits badi note 939522 product planning table assignment, time stream editor note 856213 bar chart displayed, requests note 858383 user exits apo pp/ds
Related Notes :
1045639 | Consulting notes in SNP/CTM |
827835 | Rescheduling to alternative resource not possible |
714929 | Changing characteristic and class master data for CDP |
713054 | Branching backwards in decision tables |
705018 | Change from PPM to PDS (documentation) |
699773 | RPM consulting note: Restrictions |
660411 | Time scale settings are not copied |
660113 | Performance: Setting up DS planning board for Release 4.0 |
653925 | BADI enhancement for multi-level PP/DS plan |
645719 | Processor-based setup logic |
644403 | Changing the validity mode during the planned explosion |
641871 | Suppress the display of activities of a particular type |
633895 | Customer-defined symbols in detailed scheduling plng board |
628739 | APO 3.x Release restrictions for MRP areas |
627377 | Consulting Note : Model-Mix-Planning and Sequencing |
627361 | Name of the reports generated from the decision tables |
619976 | Special procurement types in APO (documentation) |
619973 | R/3 - APO integration and Customizing changes (document) |
619898 | Production in another location (documentation) |
619092 | User exit: Taking correct account of quota arr. in planning |
617283 | Migration of discontinuation data :SAP_BASIS 46C and below |
613601 | Scope of ATP check of production orders |
610873 | SCM: Using reference characteristics in PP/DS-PDS |
607428 | Product planning table - FAQs |
605855 | Enqueue queue time in the syslog for parallel MRP |
601990 | External relationships (documentation) |
599717 | Shelf life of batch stocks without production date |
594982 | Push production (documentation) |
594318 | APO 4.0: Purchase order handling release with MRP areas |
593463 | Restructuring storage location MRP areas |
592465 | Tips for using the detailed scheduling planning board |
591115 | MRP areas in APO (documentation) |
590649 | Rules for customer-specific DS heuristics |
590647 | Empty fields in the dialog box for the field selection |
587095 | Parameters not found in strategy profile |
584657 | Ineffective decision step |
584204 | Planning standard lots for continuous I/O (SAP_PP_C001) |
584051 | Multiresource planning (primary resource) (documentation) |
582545 | Change to the line height when an allowed value is changed |
582212 | External planning (Documentation) |
578839 | Safety stock requirements in LiveCache |
577787 | Modification: Check 'Mode priority' during order creation |
577158 | Withdrawal from alternative plant in APO (documentation) |
575624 | Locking concept in APO PP/DS (documentation) |
574962 | Sequence of the graphic object within a line |
571265 | Receipts/requirements are displayed incorrectly |
565972 | FAQ: External procurement in PP/DS |
560969 | Rescheduling: Bottom-Up (SAP_PP_009) |
559785 | Products repeatedly in the product chart |
557731 | Planning file entry + reuse mode (documentation) |
553033 | BADI enhancement for the standard heuristics SAP_PP_002 |
551124 | APO: Finite scheduling with MRP heuristic (documentation) |
542779 | Problems when planning with alternative resources (modes) |
538894 | Scaling the axis for the curve view |
538201 | Groff reorder procedure/part period balancing |
532979 | Pegging in optimization |
532700 | Non-work times do not hide |
532018 | Resource alerts are not displayed in planning board |
531821 | Date change in product view and detailed scheduling |
528189 | Additional information about block planning |
528154 | BADI for 'Manual planning with availability check' |
526883 | CDP: Unspecified characteristics in planning and pegging |
525433 | PPM generation with lot size margin: consumption det. |
525175 | Probs. with segmented retroactive loading in planning board |
523663 | Displaying activities in the product chart |
519070 | Planning without final assembly (documentation) |
518556 | Using heuristics in the production planning run |
517898 | PP: Standard methods for safety stock planning |
517426 | Planning time fence in optimization |
517264 | Documentation: master data functions in APO |
516260 | PPM generation: Functionality description (II) |
513827 | Settings/parallel processing in the PP/DS planning run |
494486 | PPM: Bucket consumption calculation during generation |
492747 | Display of PI-operations and PI-phases in DS planning board |
487166 | Relevance of stocks to MRP |
485231 | Explosion of PPM of reference product for product variant |
481906 | SNP - PP/DS integration (documentation) |
480292 | Multilevel ATP (documentation) |
460431 | More objects in network view after rescheduling |
459694 | Finite scheduling with CTP or SAP_MRP_002 (documentation) |
458996 | Fixed pegging in SAP APO (documentation) |
457723 | Planning period with PP heuristics |
455421 | Comparing multi-level ATP and CTP (documentation) |
449565 | Integration with CDP in APO (Characteristics Dependent Pl.) |
449263 | User exit: Alternative sources of supply not checked in MRP |
448960 | Net requirements calculation (documentation) |
445899 | Problems in planning with sequence-dependent setup times |
441740 | Planning time fence in APO: Documentation |
439596 | Notes on Customizing planning processes |
439379 | PPT: Explanation: Days' supply in periodic view |
436887 | 'Incorrect entry in table' when planning board is called |
435366 | BAdI for additional checks when converting orders |
426705 | Guidelines for note searching in APO-PPS |
426563 | CTP: Settings, system behavior and performance (docu) |
413822 | Safety stock in APO PP/DS (documentation) |
411733 | PPM transfer: Functionaliy with changes |
403102 | Offset takes non-working time of resource into account |
397989 | PP/DS: Scheduling (Documentation) |
395321 | Planning with shelf life in APO 3.0 |
393437 | Pegging in APO: background information (documentation) |
392712 | SPN orders in the PP/DS detailed planning |
391358 | Missing order in the product chart |
390850 | Scrap in APO and R/3 (documentation) |
385602 | Validity in APO (Documentation) |
374819 | Not all graphical objects are displayed |
374307 | Object display in the detailed planning board |
357178 | Examples for customer enhancements in runtime object |
331664 | APO PP/DS: Material status |
330153 | PPT: Explanation - quantity display in periods |
324483 | APO-CIF: Goods receipt processing time |
323884 | PPM Conversion: Description PPM conv. PP/DS -> SNP |
312578 | Display problem with pegging relationships |
307336 | Object locked by user |
190706 | Time zone of the planning board |