Solution : https://service.sap.com/sap/support/notes/481906 (SAP Service marketplace login required)
Summary :
This SAP Note addresses queries related to the integration of Supply Network Planning (SNP) and Production Planning and Detailed Scheduling (PP/DS). Key topics discussed include differentiating between SNP and PP/DS plans, the concept and setup of mixed resources, as well as strategies to prevent stock discrepancies caused by plan conversions. The document explains the role of heuristics and their function in considering shortages and order sequences at the end of the planning horizon. Additionally, it includes guidance on handling lot sizes during SNP to PP/DS conversion and the selection of suitable planning areas and strategy profiles.
Key words :
total lead time setup times setup costs delay costs mode costs, lot size planning reduces setup costs, pp/ds planned orders generate overloads, snp handles pp/ds receipt elements, delay pp/ds planned orders, snp optimizer performs cost-based optimization, pp/ds horizon==================pp/ds planning, snp planning====================================================pp/ds receipt elements, fixing pp/ds planned orders, adjust pp/ds planned orders
Related Notes :
663297 | Strategy settings for planning (documentation) |
571118 | SNP2PPDS: BADI for modification of lot sizes |
516260 | PPM generation: Functionality description (II) |
513868 | Modification: SNP-PPM and change statuses |
448960 | Net requirements calculation (documentation) |
441102 | Consulting notes in PP/DS |
329733 | R/3 and CIF concerning Resources |
323884 | PPM Conversion: Description PPM conv. PP/DS -> SNP |
321474 | PPM:User exit BSP s.code f.autom. bucket cap.determ. |