Solution : https://service.sap.com/sap/support/notes/370601 (SAP Service marketplace login required)
Key words :
/scm -> mysap scm technology -> performance, sap apo installation 3, terms sap apo, response time behavior, sap service marketplace, _frame=container&_object =011000358700002439142002, composite sap note, support package level, symptom performance problems, sap apo system 3
Related Notes :
734649 | Modif.: Performance when displaying planning status |
728328 | Performance when fixing/unfixing operations |
728186 | Performance for selections in production planning run |
702814 | Performance of order creation w/ characteristic propagation |
690148 | Performance problem in the material master (buffering) |
686053 | Reading stocks and orders takes a long time |
685258 | Performance: Requirements view call |
682996 | PPT: time_out shortdump on selecting big value of MATLOC |
661789 | Performance: Duplicate entries in order table |
660113 | Performance: Setting up DS planning board for Release 4.0 |
644493 | MSP Performance Improvements |
643267 | Order view: Performance for changed capacity requirements |
641720 | Too many messages cause a performance problem |
641084 | Performance of periodic planning with a calendar |
634808 | Performance problems with BAPI_PPDSSRVAPS_SEQGETNEXTORDS |
630729 | Error message after you change planning board profile |
621284 | PPT: Performance when using Alert monitor as subscreen |
617852 | /sapapo/om17: Stock check with characteristics |
613844 | 'RETRY' problem for SD documents with product allocation |
609294 | Sorting missing for the operation table |
604939 | Performance problem with /SAPAPO/LOC_LOCIDS_GET_LOCNOS |
604708 | LOC: BSV is ignoredt during reading |
602969 | Overhead in function /SAPAPO/DM_LOCID_GET_LOCATION |
602968 | PPT: Performance of periodic views |
601246 | CTM: Runtime of order selection with lots of models |
600478 | Long runtime with planning on active version |
600421 | Performance during new explosion |
596031 | Performance improvement in creating an operation chart |
595795 | Long runtime when setting up an operation chart |
594311 | SNP2PPDS: Performance |
594245 | Poor performance: Selecting detailed sched. planning board |
593760 | Poor performance when starting the planning board |
592238 | Performance: SCHED_CATALOGUE_BUILD |
591422 | PPT: Modification for improved performance |
591248 | Performance improvement when excluding PPM read. |
589720 | PPT: Double-click performance in navigation tree |
588634 | Performance for product and location split maintenance |
588043 | ATP_CATALOGUE_EXTRACT_NEW performance |
586412 | Performance: Long runtimes during rescheduling |
565415 | Perform.: Long runtime when structuring the planning board |
564625 | Performance: Setting up and updating the planning board |
558302 | Performance when planning with characteristics |
556098 | Performance improvement about reading the shipping calendar |
549495 | Deficiency with horizontal segments in planning board |
546367 | Performance: Product view with many batch stocks |
543275 | Performance improvement with location selection |
539820 | SAPBWNews BW 3.1 Content Support Package 03 |
538211 | Bad performance for planning function in planning board |
537258 | Performance: Product view |
536574 | Performance:Receipt/requirements view with several products |
535194 | Performance: Product view with several individual sections |
533824 | Environment analysis for dynamic charts |
533272 | Performance problems when reading campaign data |
530471 | Planning board performance after note 524835 |
525961 | Status line only allows 80 characters |
523217 | SAPBWNews for BW 3.0A Support Package 12 |
517698 | Update: Performance improvement |
511523 | Deactivating geocoding in the location user exit |
504605 | Allocations: Performance in reading product all. assignment |
503634 | Receipt/requirements view: Performance after changes |
501446 | List of all composite and FAQ notes about APO ATP |
458702 | SAPBWNews BW 3.0A Support Package 10 |
458699 | SAPBWNews BW 3.0A Support Package 09 |
457521 | Problem description in scheduling and planning log |
457391 | Detailed scheduling planning board performance improvement |
456125 | Performance: Unnecessary data determination |
453331 | Missing separation line in DS runtime analysis |
452632 | SAPBWNews BW 3.0A Support Package 08 |
452631 | SAPBWNews BW 3.0A Support Package 07 |
452630 | SAPBWNews BW 3.0A Support Package 06 |
444832 | Network alerts in alert monitor called via planning board |
440314 | Error message after action with displayed alerts |
436687 | Composite SAP note: APO integration performance |
432341 | Performance in PP: working without simulation version |
431657 | Performance when reading local production data |
429737 | Performance: Mass conversion of orders |
428271 | Performance of CIF purchase orders |
425998 | SAPBWNews BW 3.0A Support Package 05 |
425997 | SAPBWNews BW 3.0A Support Package 04 |
425995 | SAPBWNews BW 3.0A Support Package 03 |
425470 | Performance problems in reading past alerts |
424886 | Parameter values as of liveCache Version 7.2.5 |
422631 | Performance: Displaying alerts in PP |
421820 | Transaction start in Easy Access: System hangs |
421716 | Backorder proc.: Writing of the queue waits for alerts |
421657 | Backorder processing: runtime display |
421358 | Backorder proc.: Deletion of alerts takes a long time |
421206 | PP: Use of a single SIMSESSION in the Alert Monitor |
421087 | PP/DS: Going to change mode takes a long time |
421030 | Backorder processing: Long runtimes for update |
420681 | ATPFIELD is filled with unnecessary information |
420639 | Performance: Modification with mass conv. of orders |
420400 | Memory problem when reading products to trans. lane |
417835 | APO customer req. timeout runtime error locking problem |
417598 | Posting of sales orders with several items |
417057 | Performance: Mass conversion of external procurement orders |
414730 | SAPBWNews BW 3.0A Support Package 01 |
412803 | Performance: Mass conversion of orders |
410455 | Termination of the initial supply of planned orders |
403250 | Many queue entries in statuses 'RETRY' or 'CPICERR' |
402071 | CIF-PPM: Long runtime during activation |
401026 | Performance improvements reading source of supply |
400712 | Application Log: Performance problems with SLG1 |
399731 | SNP optimizer: Performance (Calender+Transport) |
398952 | Poor performance when you refresh the curve diagram |
398782 | Transportation lanes: Performance improvement during the rea |
398163 | SNP Optimizer: Performance after SP10 |
398020 | Initial data transfer: Performance of matl master transfer |
397599 | SNP Optimiser: short dump because of ABAP Memory |
397533 | Delta report performance: Stock comparison |
396676 | SAPAPO 3.0 COM object Build 18 |
396586 | CIF-PPM: Performance and memory problems |
394088 | APO customer requirements performance |
393378 | Garbage collection beyond 600MB |
393052 | Mass processing: Space problems |
392197 | APO-CIF: QRFC alert for inbound queues |
392045 | APO performance initial data supply of sales order |
392031 | MacroBuilder: performance problems in mass processing |
391780 | Delta report: Long runtime for sales order comparison |
391507 | Performance APO initial supply sales order |
390163 | Supplement to note 335466 ABAP runtime error |
389849 | pi0.2sp4: Do not create any error messages for DLV & TRA |
389618 | Composite Note: APO initial data transfer with sales orders |
389027 | Initial supply terminates with error |
388839 | APO initial data transfer performance with sales orders |
388754 | Performance in the SNP heuristic |
388528 | APO-CIF: Change to inbound queues |
388317 | Source determination performance |
388001 | R/3-APO-CIF: Conversion to inbound queues |
387706 | Initial supply of APO with sales orders |
387130 | Performance: Reading transportation lanes/orders |
387041 | DP 3.0: performance data entry in the grid |
386597 | PPM: Poor performance for function module |
386466 | Performance of initial supply of sales orders |
386404 | Initial supply of APO with sales orders |
386137 | Performance of initial supply with sales orders |
385878 | DP 3.0: Drilldown performance |
385548 | Mass processing: Performance of the lock logic |
384971 | System parameters for high interface load |
384168 | Locked sources of supply scheduled |
384077 | APO: Optimizing CIF Communication |
383057 | Source determination:Performance/quota arrangemnt |
382050 | Deleting (SD) orders: database index is inactive |
381005 | Mass processing: Performance improvement for SP10 |
380927 | DP 3.0: Performance batch processing |
379567 | Performance: Creating the detailed scheduling planning board |
377763 | DP 3.0: Performance of characteristics combinations generatn |
375576 | Performance when exiting interactive planning |
375566 | Large number of entries in tRFC and qRFC tables |
375193 | Backorder processing: Composite SAP note on posting |
374910 | External procurement relationship: Performance / lock table |
374346 | ST05: Performance trace display takes very long |
373269 | APO PP/DS: immediate automatic planning |
372541 | Performance while rescheduling for continual input/output |
372306 | Performance: Determine texts for graphical objects |
371281 | PPM: Incorrect join condition view /sapapo/v_prbres |
370579 | Demand Planning 3.0: Performance Drill Down |
370189 | Performance: Change sorting after planning operation |
369007 | qRFC: Configuration for the QIN Scheduler |
368938 | Performance improvement for consumption |
367111 | Demand Planning 3.0: performance of drill down |
366239 | Demand Planning 3.0: Proportion calc. performance |
366076 | APO PP/DS: Performance in Product View |
365030 | Poor performance for reading order data |
364600 | Automatic planning displays timeout error |
363221 | Consulting: Proportional factors / version copy |
363207 | Perfomance: the rescheduling of operations |
363092 | Demand Planning: Performance Mass Processing |
359912 | PPM: Performance problems d. safety stock planning |
359761 | Demand Planning: loading performance data |
357577 | PPM: Incorrect join cond. view /sapapo/v_prcres |
356850 | PPM maint.:Miss second. Index for PPM table access |
350804 | Message handler: Performance improvement |
350172 | Performance: Rescheduling for best-selling materials |
339131 | ATP: Performance rescheduling w/ many documents f same mat. |
337617 | Unnecessary seconds on capacity planning table |
335575 | Performance: Rescheduling for best seller materials |
335558 | Allocations: Performance improvement of rescheduling |
332053 | Performance: Sorting charts |
331554 | Demand Planning/Kernel 4.6D/POSTING_ILLEGAL_STATEMENT |
330859 | Performance when determining order data |
330854 | ATP: Performance of rescheduling SD |
330530 | Unnecessary call of generic object services |
327974 | No import of material master for APO materials |
327142 | Poor performance as result of automatic sorting |
326037 | Bad performance in rescheduling/background processing |
325298 | Integration APO <--> R/3, sales order, queue error |
322815 | Performance: Reading activities |
321964 | Error in activating table MMRP_REQS |
321954 | Performance in rescheduling |
317093 | Bad performance when reading sales order data |
308538 | Performance problems in integration |
307668 | Performance of scheduling agreement processing |
211940 | Performance problems with the deletion of logs |
198852 | Performance: Creation of the planning board |
195157 | Application log: Deletion of logs |
184407 | Performance: Setup time of APO planning board |
180605 | Oracle database parameter settings for BW |
178337 | Performance: Network presentation orders/operations |
166096 | qRFC installation for 3.xx, 4.0x, 4.5x and 4.6x |
160931 | Performance: Display alternative resources |
160005 | Allocations: Improve performance of rescheduling |
159068 | Performance: Creation of APO planning table |
153667 | Performance SDV03V02 |
150882 | Performance: Calling the APO planning board |
129252 | Oracle DB Statistics for BW Tables |
127715 | CBO: Optimum parameters for performance |
114716 | Performance problems Oracle 8.0.4/all entries |
103212 | Bad performance during SD document update |
90230 | Performance of rescheduling |
74141 | Resource Management for tRFC and aRFC |
19466 | Downloading SAP kernel patches |
11777 | ORA-1632 max # extents <n> reached in index <ind.> |