SAP Transaction KKA2 - Project Results Anal. and WIP Calc.

Related Notes
564866Special periods are ignored in shortened fiscal year
560977KKAJ: Unrequired calls of AD19_ENVIRONMENT_DATA_GET
393782Performance: Results analysis
1148514Results analysis returns incorrect periodic values
982449Revenue Affecting Net Income displayed is wrong
460415AD01 154/155/156 'Error during material determination'
409475WBS elements display too high actual costs
730129CO period block for bus. processes KABG and KABM: Versions
152364Messages KJ477, KJ478: non-assigned values
208160Fixed portion should generally be equal zero
190730KAZ1 sets status I0082 incorrectly
115415Costs of deleted activities in the planning board
44090Manual results analysis only in periodic display
486699WIP calculation + results analysis ignores special periods
485405 Results analysis: Object currency
408277KKAJ:values of lower-level objcts are not taken into account
634295Customer enhancement 5: EXPORT_OBJEKTE-CHECK changeable
1519374Credits from planned settlemt are not taken into account
607406Down payment clearing and commitment processing
454124WIP calc/results analysis: End indicator D and period lock
34231WIP: Number range does not exist
200646RA: Cumulation of actual costs/actual revenues
194746Incorrect status during results analysis
319470RA: Calculated revenue w/Completed Contract
141587Input quantities in customer enhancement 1
366000Valuation at line ID level and valuation basis
525804Changing the results analysis key
331328Project structure B for valuated project stock
406917Dependent orders for WBS element or sales order
353661Status management: time-dependent statuses
485783Results analysis: Object currency
363606KKAJ: Problems with selection
16128Display of planning data in results analysis log
485786Customer enhancement 5: Object currency control
181889Resource-related billing: Error in results analysis
314354Rslts anal.prg trmtn due to lng rntme or mry o/flw
498213Credit lines from settlement in the results analysis
212899Results analysis calculates incorrect values
332425Message KJ129, message KJ130
1393267Performance improvement for results analysis
209220Valuation method: Project structure
196067Results analysis and shortened fiscal years
701077FAQ 2: PS Period End Closing
328424Changing results analysis cost elements
501915Creation, cancellation, and usage of reserves
713494Unassigned commitment or down payment values
545095FAQ 2: billing/accrual/quot./results analysis
616869 Valuated sales order stock and results analysis
38070Revenue in excess of billings/revenue surplus per line ID
190816CO cutoff period for Transactions KABG and KABM
78423Val. methods: 'Project structure' parameter
785626Valuated sales order stock and results analysis
1032262KEAW: Differences in WIP due to Note 38070
332104Results analysis: Cross-company valuation
425302Wrong settlement of results analysis data
322359Valuation method: Parameter 'Overall plan'
185215Results analysis method 14: Update
19418Manual Results Analysis: Supplement to the Documentation
502571Results analysis of project - meaning of billing indicator
18472Unassigned plan or actual values
506451Conversion program for time-dependent status
616839 Daily or weekly project results analysis
539947Status in the results analysis and WIP calculation
302823Message KJ161
367927Differences between results analysis and settlement
525009Manufacturing orders for WBS elements in results analysis
501156DP90/DP95: Composite SAP Note for performance notes
370110CJC1: missing documentation
388354Message KJ216 or KJ217: analysis instructions
26002Cust.enhance 1 of results analysis, doc.enhance