SAP Transaction CN33 - PDM-PS interface

Related Notes
585665CN33: New edges not stored anymore
526252Project System, material: Consulting notes
135363CN33: CP752 Long text does not exist
706900Report ZZKANTE2: WBS BOMs and blank edges
172670CN33: Sales order valuation is lost
603095CN22/CN33: Incorrect main assembly on 'Assignments' tab page
605692CN33: Sales order BOM in the project stock (351451)
123229CN33: Item line not transferred to PReq
95748CN33:Preliminary rqmnt f.component w/o material no.
602307Sales order BOM in project stock II
359036Sales order BOM in non-valuated stock
625857351451: Work breakdown structure BOM is not transferred
1089462Purchase requisitions: Change documents for new items
173664@3Z@Collective note: Lost char. value assignments
607135CN22/CN33: Incorrect main assembly on 'Assignments' tab page
427450CN22: selecting activities with reference point
357206New functions for item categories as of Release 4.6
131666CN33: Message 29002 Inconsistent Data
354384Automatic source determination in the network
606273RSPSP records are not deleted
356553Itm categories for components in network as of 4.6
132150Networks with some thousand components
663775351451: Sales order item is not displayed
376227CN33: CNEX0027 for storage location is not processed
544504Additional information for the material component
677169FAQ 2: Material and Project System
351451Sales order BOM in project stock
428342CN33: No deletion after initialization of reference point
686396No serial number display in production order
131904Problem when assigning many components to network/order
497771Explosion configured material in sales order BOM