Solution : https://service.sap.com/sap/support/notes/351451 (SAP Service marketplace login required)
Summary :
When dealing with sales orders and project controlling involving valuated project stock, the system incorrectly inherits BOM determination from either the work breakdown structure or material BOM instead of the specific sales order BOM. This issue limits the simultaneous use of configurable BOMs and valuated individual stock. To resolve this, assign the sales order BOM items using transaction CN33, ensuring the system retains the link between the network component and the sales order item during MRP processes and across production or purchasing workflows. Planned enhancements and schema adjustments in ABAP Dictionary and function modules are required for accuracy in stock assignment and BOM determination.
Key words :
country-specific sap user groups, valid sales order bom exists, individual multi-level requirements planning, assigned wbs element level, work breakdown structure bom, sap standard program corrections, sales order item remains -, valuated project stock inherit, relevant sales order bom, valuated individual stock
Related Notes :
819074 | 351451: Incorrect dates after MRP run |
814644 | 351451:MRP selects order BOM with incorrect use |
686396 | No serial number display in production order |
677971 | 351451: Problem in MIGO -> Error message V1 133 |
663775 | 351451: Sales order item is not displayed |
625857 | 351451: Work breakdown structure BOM is not transferred |
605692 | CN33: Sales order BOM in the project stock (351451) |
602307 | Sales order BOM in project stock II |
581099 | V1133 during PP order confirmation with backflush |
560406 | Message V1139 during confirmation for a production order |
526252 | Project System, material: Consulting notes |
524356 | Problem with PReq from MRP under Note 351451 |
372761 | Sales order item is missing when purchase order is created |
359036 | Sales order BOM in non-valuated stock |
13023 | Why was a BOM not exploded? |