SAP Table VSPROJ_CN - Version: Project definition

Field Key Data Element Type Offset Leng Decimals Check Table Text
MANDT X MANDT CLNT 0 3 0 T000 Client
VSNMR X VSNMR CHAR 3 12 0 Number or description of a version
PSPNR X PS_INTNR NUMC 15 8 0 PROJ Project definition (internal)
PSPID PS_PSPID CHAR 23 24 0 Project Definition
POST1 PS_POST1 CHAR 47 40 0 PS: Short description (1st text line)
OBJNR J_OBJNR CHAR 87 22 0 ONR00 Object number
ERNAM ERNAM CHAR 109 12 0 Name of Person who Created the Object
ERDAT ERDAT DATS 121 8 0 Date on Which Record Was Created
AENAM AENAM CHAR 129 12 0 Name of Person Who Changed Object
AEDAT UPDAT DATS 141 8 0 Date on which object was last changed
KIMSK PS_KIMSK CHAR 149 24 0 Selection mask for WBS element short IDs
AUTOD PS_AUTOD CHAR 173 1 0 Automatic value transfer from WBS element to project def.
STSPD PS_STSPD CHAR 174 8 0 Status profile for project definition
STSPR PS_STSPR CHAR 182 8 0 Status profile for WBS element
VERNR PS_VERNR NUMC 190 8 0 TCJ04 Number of the responsible person (project manager)
VERNA PS_VERNA CHAR 198 25 0 Name of responsible person (Project manager)
ASTNR PS_ASTNR NUMC 223 8 0 TCJ05 Applicant number
ASTNA PS_ASTNA CHAR 231 25 0 Applicant
VBUKR PS_VBUKR CHAR 256 4 0 T001 Company code for the project
VGSBR PS_VGSBR CHAR 260 4 0 TGSB Business area for the project
VKOKR PS_VKOKR CHAR 264 4 0 TKA01 Controlling area for the project
PRCTR PRCTR CHAR 268 10 0 Profit Center
PWHIE PS_PWHIE CUKY 278 5 0 TCURC WBS currency (project definition)
ZUORD PS_ZUORD NUMC 283 1 0 Network assignment
TRMEQ PS_TRMEQ CHAR 284 1 0 Indicator: WBS dates detailed by activity dates
PLFAZ PS_PLFAZ DATS 285 8 0 Project planned start date
PLSEZ PS_PLSEZ DATS 293 8 0 Project planned finish date
WERKS WERKS_D CHAR 301 4 0 T001W Plant
KALID FABKL CHAR 305 2 0 TFACD Factory calendar key
VGPLF PS_VGPLF NUMC 307 1 0 Planning method for project basic dates
EWPLF PS_EWPLF NUMC 308 1 0 Planning method for project forecast dates
ZTEHT PS_ZTEHT UNIT 309 3 0 T006 Time unit in time scheduling
NZANZ NETZOBERFL CHAR 312 1 0 Indicator: Network header visible to end user
PLNAW PLNAW CHAR 313 1 0 TCA09 Application of the task list
VPROF PROFIDNZPL CHAR 314 7 0 TCN41 Network profile
PROFL PROFIDPROJ CHAR 321 7 0 TCJ41 Project Profile
BPROF BP_BPROFIL CHAR 328 6 0 Budget Profile
TXTSP SPRAS LANG 334 1 0 T002 Language Key
KOSTL KOSTL CHAR 335 10 0 Cost Center
KTRG KSTRG CHAR 345 12 0 CKPH Cost Object
AEDTE PS_AEDTE DATS 357 8 0 Date of last scheduling of the overall network (basic dates)
AEDTP PS_AEDTP DATS 365 8 0 Date of last scheduling of the overall network (forecast)
BERST PS_BERST CHAR 373 16 0 Authorization key for project master data
BERTR PS_BERTR CHAR 389 16 0 Authorization key for project dates (WBS)
BERKO PS_BERKO CHAR 405 16 0 Authorization key for costs and revenues
BERBU PS_BERBU CHAR 421 16 0 Authorization key for project budget
SPSNR PS_ISPSP NUMC 437 8 0 PROJS Current number for standard project
BESTA PS_BESTAND CHAR 445 1 0 Project stock
SCOPE SCOPE_CV CHAR 446 2 0 Object Class
XSTAT PS_XSTAT CHAR 448 1 0 Statistical WBS element
TXJCD TXJCD CHAR 449 15 0 TTXJ Tax Jurisdiction
ZSCHM PS_ZSCHM CHAR 464 7 0 Interest Profile for Project/Order Interest Calculation
SCPRF PS_SCHDPRF CHAR 471 12 0 TCXPS Profile for WBS scheduling
IMPRF IM_PROFIL CHAR 483 6 0 TAPRF Investment measure profile
FMPRF PSFM_PRF CHAR 489 6 0 Payment plan profile
ABGSL ABGR_SCHL CHAR 495 6 0 Results Analysis Key
POSTU PS_POSTU CHAR 501 40 0 PS: Short description (1st text line) in all caps
PPROF BP_PPROFIL CHAR 541 6 0 Planning profile
PLINT PLINT CHAR 547 1 0 Indicator for Integrated Planning
LOEVM LOEVM CHAR 548 1 0 Deletion Indicator
INACT PS_INACT CHAR 549 1 0 Indicator: Project definition inactive
KZBWS KZBWS CHAR 550 1 0 Valuation of Special Stock
SMPRF SIM_PROFIL CHAR 551 7 0 TCN54 Simulation profile
FLGVRG PS_FLGVRG CHAR 558 1 0 Indicator: Bottom-up calculation with activity dates
GRTOP GRONTOP CHAR 559 1 0 Indicator: Automatic requirements grouping
PGPRF PGPROFID CHAR 560 6 0 Distribution profile
STORT PS_STORT CHAR 566 10 0 T499S Location
LOGSYSTEM LOGSYSTEM CHAR 576 10 0 Logical System
KZERB PS_KZERB CHAR 586 1 0 Indicator: Project summarization via master data charact.
PARGR PARGR CHAR 587 4 0 TPAER Partner Determination Procedure
FUNC_AREA FKBER CHAR 591 16 0 Functional Area
VKORG VKORG CHAR 607 4 0 TVKO Sales Organization
VTWEG VTWEG CHAR 611 2 0 TVTW Distribution Channel
SPART SPART CHAR 613 2 0 TSPA Division
DPPPROF AD01PROFNR CHAR 615 8 0 AD01C_PROF Dynamic Item Processor Profile
VPKSTU SEU_LEVEL NUMC 623 2 0 Node level
PSPID_EDIT PS_PSPID_EDIT CHAR 625 24 0 Project Number (External) Edited
VNAME JV_NAME CHAR 649 6 0 T8JV Joint Venture
RECID JV_RECIND CHAR 655 2 0 Recovery Indicator
ETYPE JV_ETYPE CHAR 657 3 0 T8JE Equity Type
OTYPE JV_OTYPE CHAR 660 4 0 Joint Venture Object Type
JIBCL JV_JIBCL CHAR 664 3 0 T8J6A JIB/JIBE Class
JIBSA JV_JIBSA CHAR 667 5 0 T8J6C JIB/JIBE Subclass A
SCHTYP PS_SCHED_TYPE CHAR 672 1 0 Scheduling scenario
SPROG PS_SPROG DATS 673 8 0 Forecast start date of project definition
EPROG PS_EPROG DATS 681 8 0 Forecast finish date for project definition
ORGKEY PS_INTNR NUMC 689 8 0 PROJ Project definition (internal)
INCAT VSINACT CHAR 697 1 0 Version inactive indicator
PROJ_STATUS ACTCMB_DELE INT1 698 3 0 ACTCMB_TAB Status Combination
FERC_IND FE_IND CHAR 699 4 0 FERC_C7 Regulatory indicator

449788Wilcard search for edited WBS element, project and others
421212Check report for editing masks
441749Infrastructure for wildcard search of WBS element
501462Update termination during INSERT in table VSPROJ_CN