SAP Table PROJ - Project definition

Field Key Data Element Type Offset Leng Decimals Check Table Text
MANDT X MANDT CLNT 0 3 0 T000 Client
PSPNR X PS_INTNR NUMC 3 8 0 PROJ Project definition (internal)
PSPID PS_PSPID CHAR 11 24 0 Project Definition
POST1 PS_POST1 CHAR 35 40 0 PS: Short description (1st text line)
OBJNR J_OBJNR CHAR 75 22 0 ONR00 Object number
ERNAM ERNAM CHAR 97 12 0 Name of Person who Created the Object
ERDAT ERDAT DATS 109 8 0 Date on Which Record Was Created
AENAM AENAM CHAR 117 12 0 Name of Person Who Changed Object
AEDAT UPDAT DATS 129 8 0 Date on which object was last changed
KIMSK PS_KIMSK CHAR 137 24 0 Selection mask for WBS element short IDs
AUTOD PS_AUTOD CHAR 161 1 0 Automatic value transfer from WBS element to project def.
STSPD PS_STSPD CHAR 162 8 0 Status profile for project definition
STSPR PS_STSPR CHAR 170 8 0 Status profile for WBS element
VERNR PS_VERNR NUMC 178 8 0 TCJ04 Number of the responsible person (project manager)
VERNA PS_VERNA CHAR 186 25 0 Name of responsible person (Project manager)
ASTNR PS_ASTNR NUMC 211 8 0 TCJ05 Applicant number
ASTNA PS_ASTNA CHAR 219 25 0 Applicant
VBUKR PS_VBUKR CHAR 244 4 0 T001 Company code for the project
VGSBR PS_VGSBR CHAR 248 4 0 TGSB Business area for the project
VKOKR PS_VKOKR CHAR 252 4 0 TKA01 Controlling area for the project
PRCTR PRCTR CHAR 256 10 0 Profit Center
PWHIE PS_PWHIE CUKY 266 5 0 TCURC WBS currency (project definition)
ZUORD PS_ZUORD NUMC 271 1 0 Network assignment
TRMEQ PS_TRMEQ CHAR 272 1 0 Indicator: WBS dates detailed by activity dates
PLFAZ PS_PLFAZ DATS 273 8 0 Project planned start date
PLSEZ PS_PLSEZ DATS 281 8 0 Project planned finish date
WERKS WERKS_D CHAR 289 4 0 T001W Plant
KALID FABKL CHAR 293 2 0 TFACD Factory calendar key
VGPLF PS_VGPLF NUMC 295 1 0 Planning method for project basic dates
EWPLF PS_EWPLF NUMC 296 1 0 Planning method for project forecast dates
ZTEHT PS_ZTEHT UNIT 297 3 0 T006 Time unit in time scheduling
NZANZ NETZOBERFL CHAR 300 1 0 Indicator: Network header visible to end user
PLNAW PLNAW CHAR 301 1 0 TCA09 Application of the task list
VPROF PROFIDNZPL CHAR 302 7 0 TCN41 Network profile
PROFL PROFIDPROJ CHAR 309 7 0 TCJ41 Project Profile
BPROF BP_BPROFIL CHAR 316 6 0 Budget Profile
TXTSP SPRAS LANG 322 1 0 T002 Language Key
KOSTL KOSTL CHAR 323 10 0 Cost Center
KTRG KSTRG CHAR 333 12 0 CKPH Cost Object
AEDTE PS_AEDTE DATS 345 8 0 Date of last scheduling of the overall network (basic dates)
AEDTP PS_AEDTP DATS 353 8 0 Date of last scheduling of the overall network (forecast)
BERST PS_BERST CHAR 361 16 0 Authorization key for project master data
BERTR PS_BERTR CHAR 377 16 0 Authorization key for project dates (WBS)
BERKO PS_BERKO CHAR 393 16 0 Authorization key for costs and revenues
BERBU PS_BERBU CHAR 409 16 0 Authorization key for project budget
SPSNR PS_ISPSP NUMC 425 8 0 PROJS Current number for standard project
BESTA PS_BESTAND CHAR 433 1 0 Project stock
SCOPE SCOPE_CV CHAR 434 2 0 Object Class
XSTAT PS_XSTAT CHAR 436 1 0 Statistical WBS element
TXJCD TXJCD CHAR 437 15 0 TTXJ Tax Jurisdiction
ZSCHM PS_ZSCHM CHAR 452 7 0 Interest Profile for Project/Order Interest Calculation
SCPRF PS_SCHDPRF CHAR 459 12 0 TCXPS Profile for WBS scheduling
IMPRF IM_PROFIL CHAR 471 6 0 TAPRF Investment measure profile
FMPRF PSFM_PRF CHAR 477 6 0 Payment plan profile
ABGSL ABGR_SCHL CHAR 483 6 0 Results Analysis Key
POSTU PS_POSTU CHAR 489 40 0 PS: Short description (1st text line) in all caps
PPROF BP_PPROFIL CHAR 529 6 0 Planning profile
PLINT PLINT CHAR 535 1 0 Indicator for Integrated Planning
LOEVM LOEVM CHAR 536 1 0 Deletion Indicator
INACT PS_INACT CHAR 537 1 0 Indicator: Project definition inactive
KZBWS KZBWS CHAR 538 1 0 Valuation of Special Stock
SMPRF SIM_PROFIL CHAR 539 7 0 TCN54 Simulation profile
FLGVRG PS_FLGVRG CHAR 546 1 0 Indicator: Bottom-up calculation with activity dates
GRTOP GRONTOP CHAR 547 1 0 Indicator: Automatic requirements grouping
PGPRF PGPROFID CHAR 548 6 0 Distribution profile
STORT PS_STORT CHAR 554 10 0 T499S Location
LOGSYSTEM LOGSYSTEM CHAR 564 10 0 Logical System
KZERB PS_KZERB CHAR 574 1 0 Indicator: Project summarization via master data charact.
PARGR PARGR CHAR 575 4 0 TPAER Partner Determination Procedure
FUNC_AREA FKBER CHAR 579 16 0 Functional Area
VKORG VKORG CHAR 595 4 0 TVKO Sales Organization
VTWEG VTWEG CHAR 599 2 0 TVTW Distribution Channel
SPART SPART CHAR 601 2 0 TSPA Division
DPPPROF AD01PROFNR CHAR 603 8 0 AD01C_PROF Dynamic Item Processor Profile
VPKSTU SEU_LEVEL NUMC 611 2 0 Node level
PSPID_EDIT PS_PSPID_EDIT CHAR 613 24 0 Project Number (External) Edited
VNAME JV_NAME CHAR 637 6 0 T8JV Joint Venture
RECID JV_RECIND CHAR 643 2 0 Recovery Indicator
ETYPE JV_ETYPE CHAR 645 3 0 T8JE Equity Type
OTYPE JV_OTYPE CHAR 648 4 0 Joint Venture Object Type
JIBCL JV_JIBCL CHAR 652 3 0 T8J6A JIB/JIBE Class
JIBSA JV_JIBSA CHAR 655 5 0 T8J6C JIB/JIBE Subclass A
SCHTYP PS_SCHED_TYPE CHAR 660 1 0 Scheduling scenario
SPROG PS_SPROG DATS 661 8 0 Forecast start date of project definition
EPROG PS_EPROG DATS 669 8 0 Forecast finish date for project definition
FERC_IND FE_IND CHAR 677 4 0 FERC_C7 Regulatory indicator

1421604Empty column name field when change layout in /TMWFLOW/PROJ
358473Substitution of user-defined fields of PRPS and PROJ
711979Generating measure from approp.requ.:start/finish not transf
613858BCT-IM: Performance of the 0IM_FA_IP_9 DataSource
455742BAPI_PROJECT_MAINTAIN: Runtime in CJPN_PROJEKTNUMMER_EDIT
454036Substitution of the project definition: Missing fields
494256Project: Scheduling scenario, forecast start/finish missing
325125CJ021 when creating network with refrnc and project