Solution : https://service.sap.com/sap/support/notes/391658 (SAP Service marketplace login required)
Summary :
This SAP Note outlines the manual and automated procedures to adjust system time for daylight saving changes on IBM eServer iSeries and DB2 UDB for iSeries, distinguishing between OS/400 V5R2M0 and i5/OS V5R3M0 versions. For older systems, manual adjustment of QTIME and QUTCOFFSET is required, whereas newer versions automatically update based on QTIMZON. SAP Kernel changes, affecting time settings through environment variables PASE_TZ or TZ, are explained with detailed instructions for transitioning times, emphasizing system inactivity to prevent time discrepancies during adjustments.
Key words :
/infocenter/iseries/v5r3/index, coordinated universal time offset, r3<sid>400/r3inlpgm program, r3<sid>400 library, <sid>ofr logs, <sid>ofr user, ibm eserver iseries, avoid duplicate times, ibm online documentation, pase_tz environment variable
Related Notes :
697353 | iSeries:DB4 Timezone Environment Variable/Large Time Diff |
198411 | Current data and information about time zones |
190539 | AS/400 System-status-time late/early after upgrade |
102088 | Reducing downtime when changing from summer to winter time |
100442 | Spool times are incorrect (time differences) |
91667 | Spool time in UTC time instead local time |
7417 | Conversion between standard time and daylight saving time |