Transaction SAP CO19 - Saisir mouvements

Notes associées
48529MMIM: Transaction Type for CO11, CO12, and CO13 in T158
105373CO11: Deleted goods movement always finally issued
172097CO13: Markings for goods receipts not posted
446401Goods movement overview: no check of 'vendor' field
131770CO11: Dump after calling up goods movement overview
93075Deadlocks during update in PPIS
113622CO11: Final issue indicator is not set
188367Confirmation in collective order with deleted order
85896Confirmation sets up capacity requirements again
309931Error M7066/096 when canceling confirmations
206610Confirmation:Termination for goods movment overview
501722Dump for confirmation in PP with exception NOT_FOUND
449911Transactions disappear in APO after confirmation
92900Error 53527: Confirmation w.personnel no. w/o HR
192030CO19: Reference to goods movement is lost
384283Syntax error: Confirmation for production order
355816Authoriztn check missing whn branching to transactn
197669Capacity requirements despite of final confirmation
364742Materl overview: Valuation type not ready for input
113643CO11, CO1F: Performace improvement
150787Update termination after confirmation for the order
194347Deadlocks in table MCAFPOV
90100Confirmation causes the quantity to be withdrawn = 0
318412Cap. rqmnts exist although order finally confirmed
76407CO11: Predecessor order in collective order deleted
73410Milestone confirmation w/o sub-operations from ntwrk
386310Multiple GR by-product despite firm quantity
591524Collective order processing: Undesired TAs/TBs
137840CO11: Precedng operation deletd in collective order
126898Confirmation with goods receipt for inspection lot
402286Goods movement: Incorrect reason in material document (2)
160192CO11:Prob.during qty conversion in collective order
656829Confirmation: Error M7021 w/ incorrect quantity specificatn
397354Goods movement:incorrect reason in material document
88289Delivery date missing after fin.confirmatn w.qty 0
119518No rdction of rough-cut plnning+rate-basd capacties
50901Final confirmation with automatic goods movement
945417Error in goods movements in collective order
77839CO11: Final issue indicator disappears
529054No SLED dialog box for unplanned GR by-product
208078Confirmation: Goods movements posted twice
380712Poor performance for confirmation
535816No COFC records for incorrect actual costs
125698Confirmation: Termination in goods movement overview
184272Read and lock PREQ for confirmation entry
379562Collective order processing: Not required TOs/TRs
128882CO11: Direct production assembly is open again
527074No reduction of dummy assembly for final confirmatn w. qty 0
533384Confirmation with actual costs: Duplicate CO documents poss
386138Incorrect delivery status according to GR posting
430105No available qty for batch determination in confirmation
88097CO11: Trigger point: quantity withdrawn = 0
50979Actual delivery date after autom.GR with quantity 0
62296Wrong requirements reduction of phantom assemblies
1082779System does not return to variant transaction
150819CO11: Incorrect proposed qty in collective order
542590Confirmation with actual costs: Double CO documents
323429MESSAGE_TYPE_X during goods movements from confirmations
548888Confirmation:No SLED-dialog box w/ internal 'Batch creation'
381268Update goods movements MESSAGE_TYPE_X RU 888
63829CO11/CO15:Messages from WM: batch split or similar
1718869FAQ: Confirmation
141212Reset 'Capacity requirements' indicator
365904GR order: Internal error SAPLCKMLMVCONNECT
538667No or incorrect goods issues for confirmations
190852COR6:Termination due to OPR_NOT_FOUND in coll.order
393158PP-PDC: BAPI_PP_PDC_OPENEVENT filled incompletely
111508Incorrect delivery date after conf. with quantity 0
112542CO11 w/ backflushed goods movement: Quantity withdrawn = 0
38108Automatic goods receipt for manufacture of co-products
333044Dependent goods movements with incorrect doc. date
95976Status NTUP after executing trigger point and other
536666Confirmation with actual costs: Duplicate CO docs possible
655526Duplicate CO documents for a confirmation
454709 Data loss in order/network operations
84646Qty issued too high for comp. w. fixed quantity ind.
569483Confirmation: unnecessary planned confirmations for actual c
450902Goods movement overview: No unit of measure check
487701Production/expiration/shelf life exp. date changed in batch
329179COGI: Dependent goods movement cannot be changed
351580CO11: Final issue indicator despite partial delivery
524487Order not yet created is locked
517134Confirmation: Expiration date dialog box displayed twice
306664Not possible to process future change record/error rec.
186830Confirmation: Missing reservation dates
539854Error M7071 after stock determination in the confirmation
604678COGI:Reason for goods movement not in material document
29327Confirmation: missing number ranges
492772Date transfer in confirmed operations not wanted
306537Material ledger and posting rule in order
122622Error in scheduling/capacity requirements planning
715142Confirmation in batch input: No problem messages
352079Automatic goods movements: Reason is missing
645811Confirmation with plan price 0: No costs in CO
374707Confirmation:goods movement with separate valuation
176682CO11: Deadlock because of blocked update processes
571936Goods movement overview: no check of HUM storage location
449561Goods movement overview:no error if movemnt type not allowed
736018Activities missing from operation: Dump PARAMETERS_NOT_VALID
335559SAPSQL_ARRAY_INSERT_DUPREC table AFRU