676286 | Short dump PERFORM_CONFLICT_TYPE in MF50 |
159907 | Order finish date: Scheduling with production dates |
119265 | MF50:In spite of Cancel/Exit plnd order is created |
115871 | MF50: Rounding error |
352440 | MF50: Planned order without number |
84393 | MF50: changing several planned orders behind a cell |
92336 | MF50: MS Excel termination due to incorrect path |
165852 | Period total:SAFT consumed twice (MF50, MD04) |
397515 | MF50: Message 61064 during planned order creation |
42422 | MF50: Deletion and change on detail list dialog box |
419198 | MF50: EXCEL - no decimal places |
90048 | Release of production order in batch input mode |
105029 | MF50: Quantities when calling Excel to incorrect data |
91233 | MF50: Incor. quantities in Excel w.unit conversion |
40744 | MF50: Line shift view: Terminat. when calling Excel |
194993 | MF50: Order finish date = production end date (3.X) |
135828 | MF50: EXCEL - no decimal places |
140837 | MF50: Rounding for entry or processing |
115380 | MF50: Scrap quantities |
97772 | MF50: Screen 0480 works incorrectly |
172287 | BOM in planned order exploded incorrectly (2) |
140541 | Rep.manufacturing:Short dump w.'NO_PLNUM_SPECIFIED' |
1227020 | FAQ : Planning table details |
602625 | MF50:order finish date for night shifts |
338715 | Order with zero duration: basic dates incorrect |
40534 | Planned order: Order finish date moved by one day |
84098 | Repet.manufacturing:planned order moved by one day |
713286 | MF50: Alternative unit of measure vs. Base unit of measure |
855524 | MF50: incorrect scrap qty in planned orders |
73491 | TIME_OUT or operation dates on incorrect day |
107004 | Repet.manufactrng:ordr finish date one day too late |
88432 | BOM in planned order exploded incorrectly |
73631 | Sub-operation: Incorrect dates for duration zero |
137543 | Mf50: Rounding problems when changng unit o.measure |
111531 | MF50: Dates in the planned order one day too late |
92841 | Rep.manufacturng table:incorrect order finish dates |
362238 | MF50:quantities in incorrct cells whn calling Excel |
148891 | Error in dispatching/scheduling/time determination |
51715 | Planned order: Reset buffer tables |
384805 | Dump MESSAGE_TYPE_X in MF50 with scheduling |
63630 | Order finish date one day too early (night shifts) |
631277 | TTZ: No update of ABMNG for reporting point backflush |
99608 | MF50 with monthly periods: timeout for Feb.29.2000 |
99604 | MF50 and SOP: Excel connection |
165940 | MF70: Planned order quantities are incorrect |
380389 | ONR00 entries for object types O1, O2 without KBED |
632951 | Basic date in planned order incorrectly adjusted |
310714 | MF50: basic finish date changes with night shift |
36220 | MF50: Problem with monthly periods in the year 2000 |
614485 | Takt scheduling incorrect in case of several sales orders |
632598 | MF70:Incorrect GR qties, short dump TABLE_INVALID_INDEX |
396366 | Incorrect basic finish date in repetitive manufacturing |
209109 | Basic dates are on non-working day after adjustment |
520081 | ONR00 entries for object types O1, O2 without KBED |
119518 | No rdction of rough-cut plnning+rate-basd capacties |
364286 | MF50: Conversion of planned order does not work |
61924 | BS001 'No status object is available for &' |
325734 | Dispatch planned order: operation shrinks / CY 744 |
96413 | Double capacity requirmnts recs / termination CO888 |
438291 | Planned order (Conversion): Scheduling type with times |
536617 | Order dates of planned order incorrect for night shifts |
186315 | MF50/MC94: Excel --> changing the default file path |
194019 | Basic dates, production start are incorrect |
184543 | Scheduling planned order: Incorrect component dates |
309286 | MF50: Short dump NO_PLNUM_SPECIFIED |
178525 | MF50: Explanation --> scheduling as of Release 4.0 |
150705 | Planned orders displayed in dialog box despite of deletion |
210365 | Requirements dates of material components empty |
92050 | Creating run sched. headers w/ same validity period |
324526 | MFxx: Inconsistency of PLAF and BLPR |
316081 | ONR00 entries for object types O1, O2 without KBED |
52065 | Deleting run schedule headers/cost collectors |
46237 | Consulting: determination of the order dates |
148632 | Incorrect results in capacity requirements planning |
194802 | Installation PCS Automotive Supplier 4.6B |
186589 | Inconsistent planned orders for parallel accesses |