SAP Transaction ME51 - Create Purchase Requisition

Related Notes
102685ME51: Automatic source determination
383818ME51, ME52 and ME53 still available in the future
128097AFS Stock tansport order
355383ME51 ME51N PReq saved with docmt number '#1' or ' '
149768ME51: Automatic source determination without delivery date
445239ME56/ME57-Source Overview displays numerous OUn
127891AFS Stock transport order
132841AFS Subcontracting double requirements
159642AFS Sizespread after conversion PR to PO
154151AFS Subcontracting vendor is not set for components
336552Performance ME21, ME22, ME59
367766 Message: Delivery date 'Ex factory' is in the past
338442Third-party requisition/third-party PO GR flag
176356Creating entries in error-log during conversion to purchase
123724AFS Subcontracting header material NOGRID
433774Source assigned automatically when other possible sources
366985 PREQ: Update terminatn after deletn of sched. lines
128891AFS Conversion PR to PO
209318Round AFS values with 'Next Rounding'
170008No BOM explosion for No Grid Materials
145539AFS SD document number is not in secundary requ.
301596Sizespread in line entry
191873Dimension Values of AFS-nogrid mat. are not cleared
136267AFS point of consumption Vendor capacity
401817Incorrect reduction of capacity and performance
389636 Create subcontracting PReq with nogrid header material
304975Rounding button in Line Entry Screen
377025 Error message 00055 when creatng stock transfr PReq
551865 ME21/ME21N SG105 for the selection from reference document
385681Performance of Capacity
209504Copy PReq: Change dimension message 8J 037
369817ME51N vendor is not written in components
82210Price is required entry via ME_REQUISITION_EXT
176228Invalid stock category in the contract
148623MPN - source determination - performance
501908Stock transfer order with reference on PReq
210718Suppressing AFS SC components with quantity of zero
336195Incorrect quantity in BOM explosion
192328Availability check for AFS materials
181897No size conversion during size grid entry
150569AFS GR processing time is not considered in PReq.
136379AFS Vendor capacity consumption
150522AFS Subcontracting components are not correct
319154Component scrap is not taken into account
322548/AFS/SZIN not filled after grid entry
146767AFS SIzespread miscalculation
336720 Rounding error in BOM explosion
106126Creatn indicator & status empty when creating PReq
117391Rel. proced. PReq:Problems after upgrade to Rel 4.0
178306ME51: Proposal purchasing group and material group
161006AFS Subcontracting PR was not opened again
363743Error message FGV002 for purchase order or PReq
47815Subcontracting: Explosion of configured BOM
156901AFS dependend requirement is not opened
216282AFS rounding after implementing Note 209989
357601Bills of material with alternative units of measure
131301Correction of note 125341: AFS Subcontracting
140668AFS Vendor capacity wrong updated
154809ME51: Bill of material not exploded/error 61060
183762MM-SRV: No autom. source determination for services
209989Performance purchase order, purchase requisition
93358MB01: Termination in HF_FIND_BELTP_FOR_KSTAR
80920ME22:Incor. PReq after deleting purchase order item
208138Info record necessary for cross-company transfer
760328BAPI_REQUSITION_CREATE: Jurisdiction code not derived
176637AFS subcontracting PReq & POs without components
41511Posting open purchase order requisitions
906088problems with subcontracting purchase requistions for CS
382383Incor.commts update through aut.PO genratn fm PREQs
490688ME51N, ME51; ME52 short dump for PReq item w/ accnt assgnmnt
493315FAQ: Purchase requisition (general)
386770Trans. code authorization in transaction variants
513474Unwanted records w/ amount types = 0200, 0500.
606455Released purchase reqs are changed by requirements planning
138644AFS Capacity consumption overload
127261AFS Stock transport order
202093FI311: for requisition (account assignmt category U)
185733ME21: Size conversion - correction of Note 181897
171402ME21: Subcontracting with additional components
120901Hiding of columns by table control is not possible
204146Proposal of purchsing org. for PReqs fr.matl master
508417AAPM termination IS806 for several fixed assets in PReq
437658SE026: Creation of service specifications not possible
97615Incorrect currency translation for the commitment
931863ME52N: The changes could not be completely undone II
498753Line item comparison: deleted purchase orders listed
430702ME51, ME53: Delete a newly created Preq item
22332Error interface MM-CO and MM-FI
116571Outline agreement req. w/ item cat."Subcontracting"
124917No budget check during purchase order for PReq
305785Update termination w/ purchase requisition
147326Creating w. ref. to RFQ does not update PReq
635511FAQ: Purchase requisitions in the service
391011Empty or incorrect document number when saving PReq
522528Check source of supply: Message 06334,adopt.of PO price ind.
504676You cannot enter batch for stock transfer with CS material
458270G/L account determination with sales order stock