SAP Transaction ME38 - Maintain Sched. Agreement Schedule

Related Notes
191898ME38: Delivery schedules w/ scheduled quantity zero
366205Total SA dely sched.qty not equal to item quantity
747349Problms through EKPO-MENGE is <> than total of EKET-MENGE(2)
717464Problems, EKPO-MENGE is <> than the total of EKET-MENGE
847413 UM 815 when you update the shipping due date index
686785Incorrect or negative quantity in field EKPO-MENGE
1608188ME38: Missing optical ARL records
90632ME38 ME22 BOM explosion of schedule lines
655313Display of cumulatve recvd qty in ME38 w/ sched lines not ok
622903Poor performance when changing confirmation data
51465Deleted delivery schedule -> PReq keeps status B
177314Qty from user exit MEVME001 interpretd incorrectly
360990Call SKU data not poss. for sched.agr.del.sched.lne
1595346Termination of scheduling agreement processing due to ME 176
771862Incorrect EKET-DABMG after return and reversal
1547885ME38: Displaying an incorrect cumulative received quantity
793531ME38/ME22N: Message UM 814 with stock transfer items
88291ME21: Inconsistency between item and schedule lines
47734Converting PReq into DelSched: Missing statistics
81200Incorrect requirements dates in subcontract orders
430706Subcontracting, incorrect alternative BOM determined
403300Termination for new schedule line with reference to the PReq
797366MD03: Message ME 814 with stock transfer items
65818SAPSQL_ARRAY_INSERT_DUPREC for change documents
493404FAQ: Scheduling agreements
388290ME38 ME32L Displaying delivery schedules with zero quantity
114386Delete schedule lines:Dependent requirements remain
209394ME38:changing qty confirmed qty --> incorrect DABMG
785754ME38/ME84: GR cumulative quantity after EKBE sum. too low
331157ME32L:Long runtime when changng delivery schedule lines
813012ME38/ME84: Incorrect CRQ at aggregated EKBE
409130Planning: Subcontr.deliv.sched. w/ partl delivery changeable
783008ME38/ME84: Goods rcpt cumulve quant. too low after EKBE
103717Quantity adjustment after manual component change
95342Updating quantity ordered in PReq
411464EKS| long runtime during layout of statistics
152368Confirmatns do not reduce sched.lines in Trans.MD04
27999Repetition of change messages
139955Subcontracting: Partially delivered schedule lines
1548033Authorization check on transaction code ME32K
67278MRP results in EKPO-MENGE <> EKET-MENGE (program ZKOREKET)
111062Printing problems in Materials Management
385416ME22 Performance problems posting purchase order history
590758Planning open for inbound delivery after return delivery
202875Correction report: Redistribution using batch input
206399MRP: Material shortage in MD04 after planning
99673Distribution logic during stock transfers
307740Collective note: Inconsistencies in MD04
100690Inconsistencies EKET-GLMNG, EKET-WAMNG, EKET-WEMNG
128061Subcontracting: Inconsistencies in dependent requirements
196684Requirement dates of components in subcontract POs
1173982SASL, inbound deliveries, material planning
874264MB01/MIGO: Default quantity for goods receipt posting
176905Check/correction report for Note 139955
458606FAQ: Subcontracting in purchasing