159033 | MD11: Wrong configuration after change of material |
158881 | AFS: no BOM expl. in plnd ord for NOGRID material |
102256 | MD11: No BOM explosion for SC planned order |
605282 | MD11/MD12: Components' requirement dates |
179331 | PLOR: termination for component avail. ATP |
180317 | MD11:incorrect configuratn aftr material change |
134622 | AFS: missing button for function 'Adapt size qties' |
149363 | Genratng plannd ordr w/o AFS grid info/plannd order |
126723 | ECR: Too many components in planned order |
301273 | MD11 component selection via categories |
183512 | No roundng aftr Cust.when creatng plnd ordrs manlly |
442419 | Underconfirmation for conversion of pl. ord. -> prod. order |
397515 | MF50: Message 61064 during planned order creation |
350452 | Unexpected display of Marker button in Planned order |
169737 | Error in planned order f.ext.procured AFS-Material |
65277 | Bill of material: No explosion in MRP |
174455 | No rounding by Cust. whn creating plnd order manlly |
82096 | MD13,MD12: Display configuration, revision level |
421497 | Rounding problems when splitting requirements |
157996 | Incor.qty distr.of compnents in plnd order procssng |
130889 | Requirmnt qty 0 for components in AFS planned order |
376908 | Planned order has component with quantity Zero |
312087 | Planning check for planned and production order |
80200 | Display of availability dates in planned order |
516684 | Rounding problems when splitting requirements (2) |
447451 | Basic finish date is moved in planned order |
146132 | Planned order: Error when component display called |
85640 | Planned order: Characteristic grouping |
647279 | Planned order: Unit of measure with availability check |
129661 | Dep.requirements date/scheduling planned order 1.0D |
443446 | Planned order/SC procurement proposals: Availability check |
86369 | MD11,MD12: directly produced compnts in plnd order |
69001 | Planned order: requirements date of mat. components |
142170 | AFS: Reference from PLO to sales order lost |
128122 | Scheduling of planned order: Changing work center |
632951 | Basic date in planned order incorrectly adjusted |
350271 | Incorrect conversion between order units |
68344 | Phantom item not exploded when creating prod. order |
39032 | No BOM explosion with production version |
359717 | Plnd order:Component reqmts = 0 after-marker maint. |
582320 | MD11/MD12:Error during basic date determin. in planned order |
386345 | Lead time taken into account twice in the planned order |
625196 | Planned order: Rounding of co-products / by-products |
190002 | MRP, planned order,... incorrect BOM explosion |
338508 | Supply STVKN, Note 183898 has no effect |
536617 | Order dates of planned order incorrect for night shifts |
13023 | Why was a BOM not exploded? |
508482 | Transaction type is not transferred correctly to the APO |
611153 | APO<->R/3: Planned order dates check (modification) |
103717 | Quantity adjustment after manual component change |
46155 | Subcontr.and phant.assemb.:SK-BED not LB-BED UK&NOTE_SYMPTOM |
303485 | Runtime problems during ATP check |
184543 | Scheduling planned order: Incorrect component dates |
483466 | By-product deleted after production order is changed |
340018 | Error using 'Adjust Quantities' w/o maintaining Bundles |
602625 | MF50:order finish date for night shifts |
160736 | Configuration for result-oriented order BOM |
122019 | Error in date proposals during component check |
600194 | APO<->R/3: Planned order dates check in SAP R/3 |
164415 | Incor. BOMs when standard matl convertd to AFS matl |
183070 | MD11, MD12: Error message 61008 in planned order |
622524 | Plnd. order: Confirmed quantities for discontinuation items |
397205 | Error message 61011 during component print |
110988 | Planned order conversion for order networks |
104216 | Termination message CO888 ERROR_BUILDING_ITAB |
312077 | Discontinued parts for variable-size items |
440179 | Global ATP in APO (Releases 3.0, 3.1) - Composite SAP note |
529275 | Plnd order:ATPSERVER not current in case of reqmts diversion |
529838 | Discontinued part: follow-up note for Note 522044 |
167138 | Change & Incorrect Components in BOM maintenance |
85980 | BOM item text in direct procurement requisition |
106602 | Item texts from sales order BOMs |
415981 | MRP explodes old status of the work breakdown structure BOM |
380807 | Incorrect components in collection proposals |
408432 | Source determination: Error ME581 / ME583 |
522044 | Discontinued part: Confirmed dependent requiremts quantities |
386279 | Lead time/lead-time offset in planned order |
1423544 | Enhancements to routing determination based on SKU |
89362 | No confirmation despite available quantity/stock |
409937 | Handling Type pop-up in process orders |
46237 | Consulting: determination of the order dates |
183898 | BOM: Components are missing after upgrade |
903552 | FAQ - AFS production control and execution |
40904 | Performance during availability check |
799948 | FAQ: Dynamic assembly |
513874 | Discontinued part in the planned order (explanatory note) |