SAP Transaction MD11 - Create Planned Order

Related Notes
159033MD11: Wrong configuration after change of material
158881AFS: no BOM expl. in plnd ord for NOGRID material
102256MD11: No BOM explosion for SC planned order
605282MD11/MD12: Components' requirement dates
179331PLOR: termination for component avail. ATP
180317MD11:incorrect configuratn aftr material change
134622AFS: missing button for function 'Adapt size qties'
149363Genratng plannd ordr w/o AFS grid info/plannd order
126723ECR: Too many components in planned order
301273MD11 component selection via categories
183512No roundng aftr Cust.when creatng plnd ordrs manlly
442419Underconfirmation for conversion of pl. ord. -> prod. order
397515MF50: Message 61064 during planned order creation
350452Unexpected display of Marker button in Planned order
169737Error in planned order f.ext.procured AFS-Material
65277Bill of material: No explosion in MRP
174455No rounding by Cust. whn creating plnd order manlly
82096MD13,MD12: Display configuration, revision level
421497Rounding problems when splitting requirements
157996Incor.qty distr.of compnents in plnd order procssng
130889Requirmnt qty 0 for components in AFS planned order
376908 Planned order has component with quantity Zero
312087Planning check for planned and production order
80200Display of availability dates in planned order
516684Rounding problems when splitting requirements (2)
447451Basic finish date is moved in planned order
146132Planned order: Error when component display called
85640Planned order: Characteristic grouping
647279Planned order: Unit of measure with availability check
129661Dep.requirements date/scheduling planned order 1.0D
443446Planned order/SC procurement proposals: Availability check
86369MD11,MD12: directly produced compnts in plnd order
69001Planned order: requirements date of mat. components
142170AFS: Reference from PLO to sales order lost
128122Scheduling of planned order: Changing work center
632951Basic date in planned order incorrectly adjusted
350271Incorrect conversion between order units
68344Phantom item not exploded when creating prod. order
39032No BOM explosion with production version
359717Plnd order:Component reqmts = 0 after-marker maint.
582320MD11/MD12:Error during basic date determin. in planned order
386345Lead time taken into account twice in the planned order
625196Planned order: Rounding of co-products / by-products
190002MRP, planned order,... incorrect BOM explosion
338508Supply STVKN, Note 183898 has no effect
536617Order dates of planned order incorrect for night shifts
13023Why was a BOM not exploded?
508482Transaction type is not transferred correctly to the APO
611153APO<->R/3: Planned order dates check (modification)
103717Quantity adjustment after manual component change
46155Subcontr.and phant.assemb.:SK-BED not LB-BED UK&NOTE_SYMPTOM
303485Runtime problems during ATP check
184543Scheduling planned order: Incorrect component dates
483466By-product deleted after production order is changed
340018Error using 'Adjust Quantities' w/o maintaining Bundles
602625MF50:order finish date for night shifts
160736Configuration for result-oriented order BOM
122019Error in date proposals during component check
600194APO<->R/3: Planned order dates check in SAP R/3
164415Incor. BOMs when standard matl convertd to AFS matl
183070MD11, MD12: Error message 61008 in planned order
622524Plnd. order: Confirmed quantities for discontinuation items
397205Error message 61011 during component print
110988Planned order conversion for order networks
104216Termination message CO888 ERROR_BUILDING_ITAB
312077Discontinued parts for variable-size items
440179Global ATP in APO (Releases 3.0, 3.1) - Composite SAP note
529275Plnd order:ATPSERVER not current in case of reqmts diversion
529838Discontinued part: follow-up note for Note 522044
167138Change & Incorrect Components in BOM maintenance
85980BOM item text in direct procurement requisition
106602Item texts from sales order BOMs
415981MRP explodes old status of the work breakdown structure BOM
380807Incorrect components in collection proposals
408432Source determination: Error ME581 / ME583
522044Discontinued part: Confirmed dependent requiremts quantities
386279Lead time/lead-time offset in planned order
1423544Enhancements to routing determination based on SKU
89362 No confirmation despite available quantity/stock
409937Handling Type pop-up in process orders
46237Consulting: determination of the order dates
183898BOM: Components are missing after upgrade
903552FAQ - AFS production control and execution
40904Performance during availability check
799948FAQ: Dynamic assembly
513874Discontinued part in the planned order (explanatory note)