SAP Transaction CJ2D - Structure planning

Related Notes
122530Performance improvements PS system
357075Calling up CNEX0012 with edited WBS element no.
61684WBS scheduling: Adjust basic dates
138641Incorrect activity display in structure planning
573113ALE: Projects are distributed with incorrect project ID
307014Required field check when saving:checks are missing
448576Default specification 'With activities' on selection screen
44632Popup for ext. no. assignment in structure planning
311229Missing messages when you create or save project
121644Dump when including standard network
460647Subnetwork via milestone function: Settlement rule
614553Short dump MESSAGE_TYPE_X due to NESTED_PERFORM_ON_COMMIT
492590Integrated release in PS: NOT_FOUND
323146Display/hide activities with deletion flag
534217WBS dates: SAPSQL_ARRAY_INSERT_DUPREC after Note 440698
451938WBS element settlement rule: Copy, performance
384128Call of CNEX0012 with edited WBS element no. II
102676Termin.when creating subnetwork and external number
615023CJ2B/CJ20N: Creating project via project definition template
556027Scheduling scenario does not overwrite the planning method
375520Update termination after creating and deleting network
83575Inform.messages for external number assgnmnt in PPB
408075Network: Error message 06334 for source of supply determintn
633557Copy WBS element: No settlement rule
420071Network costing: Complete costing instead of update
444031Structure plng -> proj. png board: Plng board profle fr. PPL
546919Douplicated heading in error log from status check
495301Deletion of last activity in the network: MESSAGE_TYPE_X
146924Include subnetwork by milestone function
574317Network: Error msge 06334 for source of supply determintn II
525853Creating network with template: Copying configuration
415283AVO_ALREADY_EXISTS w.creatng/changng ext.prcssd act.and PReq
437270CJ2B: Missing profile settings in Gantt chart/PPB
173405Network: CO888 or double activity number
188038CJ20, CJ2B: PLNAW_UNKNOWN_LCOVGFFR
418141Copying customer number proposed (after Note 396340)
130142CO010 after creating netwrk by copying stand. ntwrk
435594CJ2B: Automatic substitution/validation in network II
380175IW31/IW32: Source determination, message 06334
618707WBS elmnt: Distrbtn rule at prof seg after MasterData change
46623Creating project with reference, copy profile data
610613Copying project w/activities:Flags Res/PurcRq and Cap.reqmts
216273Termination when creating project with template
713505Milestone for WBS element displayed w/o authorization
629275Copying WBS element: Dependent data is incomplete
386032PReq for external activity: dump or incorrect plann.indictr
422905Creating component + selecting source of supply: Error ZF253
622280WBS element: Results analysis key and investment profile
137606Investment measure: authorization for fixed assets
490916Project creation with template: Data from project profile
523292WBS elements without COBRA-record
396340Address for third-party requistn in network despite 'Cancel'
503166Address for third-party requisition from SD document
481469Copy WBS element, hierarchy graphic: TABLE_INVALID_INDEX +
532324Termination CO901, CO888, C7135 after Note 217660 implementd
300641Termination CO901, CO888, C7135 after implem. of Note 217660
388778Tabstrips at batch input / conversion or changing from APO
569048FAQ 2: User status
447435Deleting activity with summarization: CL585, C6018 and other
32390Proj.summariz.: BO003 'System error: inval.obj.type'
81091Term./performance for planning board/network sched.
578106PS text migration to new SAP Office Integration (SOI)
420985User-specific time profile settings
382633Deletion of projects/networks in time-dependent versions
498761Scheduling scenario in the standard project
63506Upd.term.when saving plg.table/overall ntwrk sched.
501462Update termination during INSERT in table VSPROJ_CN
494256Project: Scheduling scenario, forecast start/finish missing
596330CJ2B: Display additional fields in table area
455255CJ2B: Font in the date bar cannot be changed
407160Project planning board: Composite note of dates & durations
500933Proj.plng board: Recomm., additional information, consulting
371842Customized options, time scales, and field selection