| 882538 | Short Dump in BDC/Batch Input session in "background" mode. |
| 456526 | CN22: Undo user settings in the Gantt chart |
| 370821 | Display of milestone not sorted |
| 644635 | Gantt chart: Text of pushbutton 'Adjust/Extend' incorrect |
| 119010 | Message CN669, positioning not possible |
| 183370 | BI: Components in ntwrk long text not transferred to PReq. |
| 390520 | No price from info record after BOM explosion |
| 34924 | Component status after BOM explosion |
| 48838 | Goods movement Reservation to Direct procurement |
| 308382 | Sorting the milestones by date in the PPB |
| 48690 | Transfer BOM item text in purch. requ. |
| 368302 | Configuration of components when copying network |
| 382492 | Double F3 for settlement rule for header |
| 165337 | Error in user exit for number assignment network |
| 125500 | Requirement qty component in transfer standard network |
| 393954 | Syntax error in LCOKOFC1 after Note 386676 |
| 391213 | Source determination in spite of material substitution |
| 32900 | Allocating source of supply f. PReq in network & prod. order |
| 167136 | Missing components for transfer of standard network |
| 35465 | Reassigning a created component in network/order |
| 86713 | No convrsn to local currency f.ext.processd actvty |
| 131671 | Creating netwrk by copying stand netwrk:Components |
| 616644 | DCM release determination if version in process |
| 46247 | 'Activate PReq/reserv.' funct. executed incorrectly |
| 190219 | CN21: Settlement rule is not determined |
| 197608 | Copying configuration for networks |
| 83592 | Copying item text to PReq from standard network |
| 134523 | ME52: PReq created from order cannot be deleted |
| 61249 | Update termination with ARRAY_INSERT_DUPREC |
| 35609 | No PReq after network/maintenance order release |
| 177520 | Change of activity element not taken into account |
| 46808 | Message 06461 when changing material component |
| 365988 | No settlement rule created for subnetwork |
| 191166 | Update termination in table VSKBKO_CN |
| 503166 | Address for third-party requisition from SD document |
| 65961 | Network: Activity dates on date limit |
| 451331 | Batch determination not possible after import of plug-in |
| 211801 | Component is not copied from standard bill of material |
| 522830 | Allocating source of supply for PReq in network II |
| 140233 | Storage location from BOM is not transferred |
| 386676 | WBS element (CRTD) can be assigned to network header (REL) |
| 50256 | Goods movement reservation for individual stock |
| 121644 | Dump when including standard network |
| 449709 | No source determination during standard network transfer |
| 518674 | Termination CONVERT_NO_NUMBER in SAPLPSSV_CHECK |
| 117543 | CN22: Overwriting material number with other POSTYP |
| 116530 | Sub-operation/element: dates one day too early |
| 72058 | Missing req.-entry flds when creating PReq for comp. |
| 102687 | Forecast set of dates: activity on non-working day |
| 40111 | Long text is not copied from component into PReq |
| 169794 | Material variant as a co-product |
| 32961 | Order/network: No automatic source determination |
| 452080 | Components from standard network not contained in network |
| 158759 | Too many DATA control blocks - SAPLCOBO |
| 586868 | CJ2B: User-specific time scale settings |
| 52186 | Purchase requisition: long texts not adopted |
| 44965 | No goods issue after reallocation |
| 375506 | CN21/22:Mandatory fields in batch input give error |
| 139685 | Performance problems w/ orders w/o header material |
| 516900 | CN21: NOT_FOUND after Note 513177 |
| 206273 | Storage location not copied from task list |
| 543643 | Missing account assignmnt check for PReq creation in network |
| 356990 | Message from budget check for BAPI / OpenPS |
| 437907 | Work center calendar not taken into account |
| 526252 | Project System, material: Consulting notes |
| 460647 | Subnetwork via milestone function: Settlement rule |
| 318458 | Advance procrmnt f.WBS elemnt gnrts multiple rqmnts |
| 50475 | Activating reserv./P.req. via menu function |
| 126656 | PReq deletd for external elemt/cap.requments deletd |
| 172215 | Transfer of 1st BOM line in PReq f. direct procurmt |
| 444609 | Function 'Select all' activities does not work |
| 142678 | Note 129796: Dump in LCOKOU04 |
| 96571 | PS: Long runtime in update2 |
| 84969 | No locking/unlocking network warning message |
| 315627 | Operation with duration 0 on date limit |
| 67963 | Changing mat./plant in component/order not in PReq |
| 173664 | @3Z@Collective note: Lost char. value assignments |
| 48401 | Maintenance order / network: no scheduling / CK060 |
| 120303 | Actual finish set incorrectly in orders/networks |
| 53959 | PReq for component without long text in order |
| 419383 | Moving columns with Drag&Drop incorrect |
| 397923 | Project pl.board:Duration/schedules for netw. |
| 100396 | Status Technically completed on operation level |
| 83854 | Component w. SOBSL f. stock transfer/subcontracting |
| 205961 | Price unit is not transferred from PReq |
| 326426 | Copying components from the standard network |
| 410768 | Unclear message CN356 during capacity check |
| 122530 | Performance improvements PS system |
| 35399 | MM-SRV Acct assignment problem in PReq from network |
| 566814 | Planning file entry for MRP is not set |
| 140494 | Network: operation dates outside the basic dates |
| 174231 | Termination when scheduling/saving the network |
| 452656 | Termination with Message_Type_X when transferring components |
| 124871 | Incorrect operation element number, Internal error |
| 459286 | Gantt chart,table section: All header fields ready for input |
| 532665 | Dump COMPUTE_FLOAT_ZERODIVIDE in the availability check |
| 216726 | Price, unit and desired vendor are not copied |
| 506146 | Directly manufactured material displayed as missing part |
| 454054 | Problems after CN379 or CN380 II |
| 102676 | Termin.when creating subnetwork and external number |