882538 | Short Dump in BDC/Batch Input session in "background" mode. |
456526 | CN22: Undo user settings in the Gantt chart |
370821 | Display of milestone not sorted |
644635 | Gantt chart: Text of pushbutton 'Adjust/Extend' incorrect |
119010 | Message CN669, positioning not possible |
183370 | BI: Components in ntwrk long text not transferred to PReq. |
390520 | No price from info record after BOM explosion |
34924 | Component status after BOM explosion |
48838 | Goods movement Reservation to Direct procurement |
308382 | Sorting the milestones by date in the PPB |
48690 | Transfer BOM item text in purch. requ. |
368302 | Configuration of components when copying network |
382492 | Double F3 for settlement rule for header |
165337 | Error in user exit for number assignment network |
125500 | Requirement qty component in transfer standard network |
393954 | Syntax error in LCOKOFC1 after Note 386676 |
391213 | Source determination in spite of material substitution |
32900 | Allocating source of supply f. PReq in network & prod. order |
167136 | Missing components for transfer of standard network |
35465 | Reassigning a created component in network/order |
86713 | No convrsn to local currency f.ext.processd actvty |
131671 | Creating netwrk by copying stand netwrk:Components |
616644 | DCM release determination if version in process |
46247 | 'Activate PReq/reserv.' funct. executed incorrectly |
190219 | CN21: Settlement rule is not determined |
197608 | Copying configuration for networks |
83592 | Copying item text to PReq from standard network |
134523 | ME52: PReq created from order cannot be deleted |
61249 | Update termination with ARRAY_INSERT_DUPREC |
35609 | No PReq after network/maintenance order release |
177520 | Change of activity element not taken into account |
46808 | Message 06461 when changing material component |
365988 | No settlement rule created for subnetwork |
191166 | Update termination in table VSKBKO_CN |
503166 | Address for third-party requisition from SD document |
65961 | Network: Activity dates on date limit |
451331 | Batch determination not possible after import of plug-in |
211801 | Component is not copied from standard bill of material |
522830 | Allocating source of supply for PReq in network II |
140233 | Storage location from BOM is not transferred |
386676 | WBS element (CRTD) can be assigned to network header (REL) |
50256 | Goods movement reservation for individual stock |
121644 | Dump when including standard network |
449709 | No source determination during standard network transfer |
518674 | Termination CONVERT_NO_NUMBER in SAPLPSSV_CHECK |
117543 | CN22: Overwriting material number with other POSTYP |
116530 | Sub-operation/element: dates one day too early |
72058 | Missing req.-entry flds when creating PReq for comp. |
102687 | Forecast set of dates: activity on non-working day |
40111 | Long text is not copied from component into PReq |
169794 | Material variant as a co-product |
32961 | Order/network: No automatic source determination |
452080 | Components from standard network not contained in network |
158759 | Too many DATA control blocks - SAPLCOBO |
586868 | CJ2B: User-specific time scale settings |
52186 | Purchase requisition: long texts not adopted |
44965 | No goods issue after reallocation |
375506 | CN21/22:Mandatory fields in batch input give error |
139685 | Performance problems w/ orders w/o header material |
516900 | CN21: NOT_FOUND after Note 513177 |
206273 | Storage location not copied from task list |
543643 | Missing account assignmnt check for PReq creation in network |
356990 | Message from budget check for BAPI / OpenPS |
437907 | Work center calendar not taken into account |
526252 | Project System, material: Consulting notes |
460647 | Subnetwork via milestone function: Settlement rule |
318458 | Advance procrmnt f.WBS elemnt gnrts multiple rqmnts |
50475 | Activating reserv./P.req. via menu function |
126656 | PReq deletd for external elemt/cap.requments deletd |
172215 | Transfer of 1st BOM line in PReq f. direct procurmt |
444609 | Function 'Select all' activities does not work |
142678 | Note 129796: Dump in LCOKOU04 |
96571 | PS: Long runtime in update2 |
84969 | No locking/unlocking network warning message |
315627 | Operation with duration 0 on date limit |
67963 | Changing mat./plant in component/order not in PReq |
173664 | @3Z@Collective note: Lost char. value assignments |
48401 | Maintenance order / network: no scheduling / CK060 |
120303 | Actual finish set incorrectly in orders/networks |
53959 | PReq for component without long text in order |
419383 | Moving columns with Drag&Drop incorrect |
397923 | Project pl.board:Duration/schedules for netw. |
100396 | Status Technically completed on operation level |
83854 | Component w. SOBSL f. stock transfer/subcontracting |
205961 | Price unit is not transferred from PReq |
326426 | Copying components from the standard network |
410768 | Unclear message CN356 during capacity check |
122530 | Performance improvements PS system |
35399 | MM-SRV Acct assignment problem in PReq from network |
566814 | Planning file entry for MRP is not set |
140494 | Network: operation dates outside the basic dates |
174231 | Termination when scheduling/saving the network |
452656 | Termination with Message_Type_X when transferring components |
124871 | Incorrect operation element number, Internal error |
459286 | Gantt chart,table section: All header fields ready for input |
532665 | Dump COMPUTE_FLOAT_ZERODIVIDE in the availability check |
216726 | Price, unit and desired vendor are not copied |
506146 | Directly manufactured material displayed as missing part |
454054 | Problems after CN379 or CN380 II |
102676 | Termin.when creating subnetwork and external number |