Solution : https://service.sap.com/sap/support/notes/91488 (SAP Service marketplace login required)
Summary :
This SAP Note provides essential preparation information for your system before scheduled SAP Support Service sessions, specifically targeting ABAP stacks. To align with the requirements, ensure that system connections are configured, and tools like RTCCTOOL and SDCCN are set up for receiving data from SAP and managed systems. Proper configuration of Installation numbers and system IDs, filling in questionnaires, using Readiness Check tools like Quick Sizer, and ensuring EarlyWatch Alerts are turned on are mandatory steps. All systems should have SAP Solution Manager configured to manage, monitor, and integrate these settings. For comprehensive service readiness, SAP Notes linked to product-specific and service-specific recommendations are provided in appendices for further guidance.
Key words :
central preparation notesap note 1306163 sap downtime assessment prerequisitessap note 1077981 sap upgrade assessment preparation notesap note 1274306 sap solution transition assessment - preparationsap note 1320940 prerequisites, bpmsap note 1318148 sap custom code change impact analysis - preparationsap note 1330674 sap custom code maintainability checksap note 1074808 sap change, sdcc toolsv-smg-ser-ewa earlywatch alertsv-bo-req request, bc-upg-ocs problems implementing support packagesbc-smg-sys problems related, sap note 1258585 sap customer relationship managementsap note 1295142 sap remote services, live supportappendix csap note 352081 additional service-relevant functions, sap pi/xisap note 1498779 preparing java-based systems, installation numbersbc-upg-addon problems implementing addons, sap solution management assessmentsap business process performance optimization, bps benchmark checksap note 1149742 sap cqc
Related Notes :
1498779 | Preparing Java-based systems for Support Services |
1405975 | Minimum Authorization Profile for Remote Service Delivery |
1330674 | SAP Custom Code Maintainability Check |
1324027 | SAP Software Solution |
1323405 | Technical Preparation of a GO, BPPO and IV service |
1295142 | SAP Remote Services for SAP SRM |
1258585 | SAP Remote Services for SAP CRM |
1257308 | FAQ: Using EarlyWatch Alert |
1172939 | Technical prerequisites for remote service delivery in SSM |
1170668 | The role of SAP Solution Manager in Remote Service Delivery |
1149742 | SAP (CQC) Going Live Support |
1077981 | SAP Upgrade Assessment Preparation Note |
1012503 | Storage for RFC Destination to Solution Manager is too short |
984434 | How to speed up customer message processing |
948066 | Performance Analysis: Transactions to use |
930747 | Service Delivery on SAP Solution Manager (Recommended Notes) |
792941 | Maintenance of transaction SDCC or SDCCN |
781680 | SDCC/ SDCCN - Problems with function modules |
763561 | Service Data Control Center (SDCCN) - FAQ |
738676 | Service Data Download for Non-ABAP Components |
713674 | SDCC for Basis Rel 4.x without ST-PI |
712757 | SDCC for Basis rel 3.x |
617604 | SAP Remote Services for SAP PI/XI |
560630 | ST-PI: Solution Tools plug-in - prerequisite not met! |
539977 | Release strategy for add-on ST-PI |
407293 | Preparing APO System with GATP for GoingLive |
320903 | Preparing the SCM (APO) system for EarlyWatch and GoingLive |
216952 | Service Data Control Center (SDCC) - FAQ |
207223 | SAP EarlyWatch Alert processed at SAP |
202934 | RFCOSCOL for NT servers using a gateway |
145316 | DB2-z/OS: Preparations for SAP Support Services |
144864 | SAP Remote Services: Technical preparation - ST03 |
69455 | Servicetools for Applications ST-A/PI (ST14, RTCCTOOL, ST12) |
19227 | Open newest saposcol |