Solution : https://service.sap.com/sap/support/notes/579216 (SAP Service marketplace login required)
Summary :
When conducting single-level or multi-level material price determination with actual costing in the SAP material ledger, various system messages like C+135, C+136, C+137, and C+138 may appear, responding to specific fallback scenarios when the calculated prices are negative or inconsistent. These include recalculating based on receipts, using prices from previous periods, or current period standard prices. Errors such as CKMLMV034 and others indicate recosting steps in iterative processes. Detailed guidance on these scenarios and system fallback strategies is available under SAP’s "Automatic Error Correction by the System" documentation.
Key words :
-> financials-> controlling-> product cost controlling-> actual costing/material ledger-> periodic actual costing-> costing run-> process flow, periodic actual costing-> performing multilevel price determination-> errors, actual costing/material ledger fallback strategy, multi-level material price determination, actual costing, reduced actual bom ckmlmv020, reduced actual bom ckmlmv005, system issues error message, reduced actual bom, actual bom ckmlmv018
Related Notes :
1039621 | CKMLCPAVR: Fallback strategy for price determination in AVR |
908776 | Not included/not allocated and not distributed |
717630 | Unclear negative price with price determination |
398143 | INFO: CO-PC-ACT (period-end closing) |