Solution : https://service.sap.com/sap/support/notes/563863 (SAP Service marketplace login required)
Summary :
This SAP Note addresses concerns related to the management of shelf life and maturation times within the system. For products to be planned with these considerations, they must have the 'Planning with shelf life' indicator activated in the product master. This setting allows the system to accommodate shelf life and maturation specifications for both stock and receipts across APO and R/3 systems. The note outlines methods for ensuring detailed shelf life tracking during transfers and within dynamic pegging processes. It also provides guidelines for setting up product and material masters correctly, and details procedures for various planning strategies that incorporate shelf life constraints.
Key words :
requirement time + required minimum shelf life <= receipt time + shelf life requirement time + required maximum shelf life >= receipt time + shelf life 8, requirement time >= receipt time + maturity time - maximum backwards edge length, 'required maximum shelf life' field, maximum backward edge length, required minimum shelf life, terms shelf lifematuration timedynamic pegging, pp/ds optimizer maturation time, bear explicit shelf life data, maintain location-specific shelf life, required maximum shelf life
Related Notes :
1548827 | Sales order: Shelf life R/3 -> APO: Settings in R/3 |
751392 | Shelf life R/3 -> APO: Settings in R/3 |
606447 | CIF Shelf life of expired batch stocks |
599717 | Shelf life of batch stocks without production date |
598616 | |
551124 | APO: Finite scheduling with MRP heuristic (documentation) |
535422 | |
483576 | Required shelf life per customer/material without config. |
446320 | Defining shelf life data based on specific location |
441102 | Consulting notes in PP/DS |
395321 | Planning with shelf life in APO 3.0 |
391018 |