Solution : https://service.sap.com/sap/support/notes/550330 (SAP Service marketplace login required)
Summary :
This SAP Note discusses several aspects of resource and capacity management within the liveCache of SAP APO. It details procedures for extending the time stream, creating and managing capacity profiles, and transferring capacities from R/3 using CIF. Notably, it outlines the need for scheduling the report /SAPAPO/CRES_CREATE_LC_RES to ensure the time stream maintains its necessary length, addressing issues that arise if unscheduled. Additionally, the note clarifies handling units for capacities, signifies an approach to prevent lock conflicts in liveCache, and delineates guidelines when adjusting resource capacity or changing resource types in Production Planning and Detailed Scheduling. Reference to other specific SAP Notes is provided for more in-depth information on certain error messages and procedures.
Key words :
day shift1 shift2 shift3so - - nightmo day1 day2 nighttu day1 day2 nightwe day1 day2 nightth day1 day2 nightfr day1 day2 -sa - - - solution consulting, day shift1 shift2 shift3mo night day1 day2tu night day1 day2we night day1 day2th night day1 day2fr night day1 day2sa - - -su - - -avoid defining, system issues message /sapapo/dmres 085, transaction /sapapo/cdps_matgen parallel changing, introduce supply network planning, message /sapapo/dmres 187 refer, report /sapapo/cres_create_lc_res periodically, report /sapapo/cres_create_lc_res extending, save selected resource lc, report /sapapo/cres_capacity_lengthen changing
Related Notes :
1428120 | Report /SAPAPO/CRES_CREATE_LC_RES: Lock problems |
1168596 | Incorrect resource type transfered from R/3 to APO |
947717 | Restrictions during maintenance of capacity profile |
851288 | Maintaining the capacity profile is not possible |
674838 | Resource transfer from APO Release 4.0 |
629676 | Resource type conversion |
448601 | Downtimes in resources |
402613 | Missing transfer of resources with CIF |
329733 | R/3 and CIF concerning Resources |