Solution : https://service.sap.com/sap/support/notes/51576 (SAP Service marketplace login required)
Summary :
In the SAP MRP context, the "Replenishment to maximum stock level" lot-sizing procedure for reorder point-driven materials is tackled without considering external demands. SAP Note highlights that the MRP generates an order proposal matching the difference between the replenishable maximum stock level and the sum of the current warehouse stock and already available fixed receipt elements. Introduction of MRP types 'V1' and 'V2' with Release 3.0D allows considering external requirements which, if exceeding current supplies, trigger an order proposal. The note explains various scenarios and formulae used for calculating the purchase order quantity when external requirements and various stock levels are factored in. No solution is provided, indicating the note mainly explains procedural handling within MRP.
Key words :
requirementsreorder point 150safety stock 0maximum stock level 999warehouse stock 200total, reorder point + total requirements - current warehouse stock -, additional key words reorder point planning, maximum stock level + requirements - current warehouse stock -, fixed receipt elements ----------------------------------------------- = purchase order quantity, fixed receipt elements ----------------------------------------------- = purchase order quantity, maximum stock levelmrp procedure reorder point, maximum stock level - current warehouse stock -, reorder point minus warehouse stock, current warehouse stock minus
Related Notes :
93989 | Maximum stock level and maximum lot size |
53343 | MRP: Reorder point with external requirements |
44984 | Reorder point planning with external requirements |
37697 | Reorder point plng: Reservations and sales order |