SAP Note 37697 - Reorder point plng: Reservations and sales order

Component : Planning Execution -

Solution : https://service.sap.com/sap/support/notes/37697 (SAP Service marketplace login required)

Summary :
Materials Planning challenges with reorder point planning (MRP types VB or VM) are identified where reservations, sales orders, and other future requirements are not factored into material planning runs, causing potential material shortages. This note emphasizes the non-inclusion of certain demand types during automatic planning which affects reorder triggering and lot-size calculation. SAP recommends using MRP type 'PD' for more comprehensive demand planning or adjusting Customizing settings to include these external requirements from Release 3.0D onward. Additionally, the note details changes in MRP types and the systematic consideration of reservations and dependent requirements tailored to specific business process needs. Modifications in system behavior post-Release 4.0A are also explained for better planning accuracy.

Key words :
safety stock level - set manually, receive unusually high sales orders, creates planning file entries, create planning file entries, higher memory requirement due, period lot-sizing procedure, future material shortages caused, creating/changing sales orders, terms consumption-based planning, system takes 'external' requirements

Related Notes :

550954FAQ: Consumption-based planning
549752FAQ: MRP elements in transaction MD04/MD05
206525MRP: Problems in reorder point planning
192954Reorder point planning:Displaying/planning reqmnts
53343MRP: Reorder point with external requirements
51576MD01: MRP type V1/V2: reorder point w. requirements
44984Reorder point planning with external requirements