Solution : https://service.sap.com/sap/support/notes/1555612 (SAP Service marketplace login required)
Key words :
import bi java patch sp23 #30, import bi java patch sp08 #30, 0 bi java import support package 25, sap business objects enterprise 4, proper safety belt calculation, correction result set size, bi java patches, 0 ehp 1 bi java, import support package 10, import support package 03
Related Notes :
1564778 | SAPBINEWS NW7.01 BI JAVA SP10 |
1549415 | NW 7.01 SP 08 Patch Level (PL) 30 for BI Java |
1549413 | NW7.0 SPS 23 Patch 30 note for BI Java |
1526201 | NW BI 7.30 Java: Delivery: SP 1 Patch 01 and SP 2 Patch 01 |
1512988 | Frequently Asked Questions:BI Java 7.30 SP's/patches |
1512356 | Patches for NetWeaver 7.30 BI Java Support Package |
1506722 | Generic Note for BI Java Patches and Support Packages |
1472919 | Result set size limit not followed by drill operation |
1468304 | SAPBINEWS NW7.0 BI JAVA SP25 |
1309000 | NW 7.01: BI Java Patch Delivery |
1177023 | 7.30 NW SP 02 Patch Level (PL) 02 for BI Java |
1055581 | Recommendations for Support Package Stacks for BI 7.0 |
1033246 | NW 7.0 (NW04s): BI Java Synchronized Patch Delivery |
1011241 | Patches for NetWeaver 2004s BI Java Support Package |