Solution : https://service.sap.com/sap/support/notes/152319 (SAP Service marketplace login required)
Summary :
The SAP Note addresses an issue where the system incorrectly displays material requirements dates for planned orders during lead time scheduling. Users should verify specific configuration settings, ensuring scheduling settings are in SAP Customizing, verifying the validity and activation status of routing, and checking that lot sizes are valid for routing. It is essential to ensure that routing is active at the time of the order and correctly set in SAP Customizing. Furthermore, planners are advised to also evaluate basic and operation dates for discrepancies and adjust in-house production times in the material master as this affects the order finish date calculation.
Key words :
safety time/lead-time offset, internally processed operation/external processing, minimum send-ahead quantity, component pp-crp-sch, pp-crp-sch component, operation dates order start date, lead-time offset stored, material master differs greatly, order start date taking, schedule externally processed operations
Related Notes :
397515 | MF50: Message 61064 during planned order creation |
207998 | MRP: Scheduling in the planned order |
194993 | MF50: Order finish date = production end date (3.X) |
156933 | Consulting: Scheduling routing |
156115 | Consulting: Scheduling of planned order for recipe |
151551 | Consulting: Scheduling of network |
151503 | Consulting: Scheduling of process order |
150007 | Consulting: Scheduling of production orders |
72721 | MD01: Basic dates in the collective order |
24222 | Positive lead-time in BOM for lead time scheduling |