MANDT |
X |
MANDT |
CLNT |
0 |
3 |
0 |
T000 |
Client |
WERKS |
X |
WERKS_D |
CHAR |
3 |
4 |
0 |
T001W |
Plant |
MTART |
X |
DISGR |
CHAR |
7 |
4 |
0 |
T438M |
MRP Group |
BANER |
|
BANER |
CHAR |
11 |
1 |
0 |
|
Creation Indicator for Purchase Requisitions |
DISER |
|
DISER |
CHAR |
12 |
1 |
0 |
|
Creation Indicator for MRP Lists |
UMTHZ |
|
UMTHZ |
NUMC |
13 |
3 |
0 |
|
Rescheduling horizon |
FIXHZ |
|
FIXHZ |
NUMC |
16 |
3 |
0 |
|
Planning time fence |
PLAHZ |
|
PLAHZ |
NUMC |
19 |
3 |
0 |
|
Planning horizon |
SBDIS |
|
SBDIS |
NUMC |
22 |
3 |
0 |
|
Share of safety stock which can be used for planning |
LIFKZ |
|
LIFKZ |
CHAR |
25 |
1 |
0 |
|
Automatic Schedule Lines (Scheduling Agreements) |
GTERM |
|
GTERM |
CHAR |
26 |
1 |
0 |
|
Scheduling according to purchasing info record or agreement |
KZDRB |
|
KZDRB |
CHAR |
27 |
1 |
0 |
|
Indicator: direct procurement/production MRP |
XFAT1 |
|
XFAT1 |
CHAR |
28 |
1 |
0 |
|
Firm Only Schedule Lines Transmitted to Vendor by Purchasing |
XFAT2 |
|
XFAT2 |
CHAR |
29 |
1 |
0 |
|
Fant. 2 |
VWVOR |
|
VWVOR |
NUMC |
30 |
2 |
0 |
|
Tolerance value for bringing forward receipt elements |
VWVER |
|
VWVER |
NUMC |
32 |
2 |
0 |
|
Tolerance value for displacement in the future |
PRREG |
|
PRREG |
CHAR |
34 |
2 |
0 |
T441R |
Checking Rule for Availability Check |
VRMOD |
|
VRMOD |
CHAR |
36 |
1 |
0 |
|
Consumption mode |
VINT1 |
|
VINT1 |
NUMC |
37 |
3 |
0 |
|
Consumption period: backward |
VINT2 |
|
VINT2 |
NUMC |
40 |
3 |
0 |
|
Consumption period: forward |
STRGR |
|
STRGR |
CHAR |
43 |
2 |
0 |
T461P |
Planning strategy group |
RESHZ |
|
RESHZ |
DEC |
45 |
2 |
0 |
|
Roll forward period for the master plan |
ANDIS |
|
ANDIS |
INT2 |
48 |
5 |
0 |
|
Number of Days After Which the Material Must Be Planned |
AUART |
|
AUFART |
CHAR |
50 |
4 |
0 |
T003O |
Order Type |
AUAR2 |
|
AUAR2 |
CHAR |
54 |
4 |
0 |
T003O |
Order type for process order |
PLSEL |
|
PLSEL |
CHAR |
58 |
1 |
0 |
|
Issue Storage Location Selection |
RVPKZ |
|
RVPKZ |
CHAR |
59 |
1 |
0 |
|
Adjustment of Planned Independent Requirements |
RESVP |
|
RESVP |
DEC |
60 |
3 |
0 |
|
Period of adjustment for planned independent requirements |
SHFLG |
|
SHFLG |
CHAR |
62 |
1 |
0 |
|
Safety time indicator (with or without safety time) |
SHZET |
|
SHZET |
NUMC |
63 |
2 |
0 |
|
Safety time (in workdays) |
MDACH |
|
MDACH |
CHAR |
65 |
2 |
0 |
|
Action control: planned order processing |
PRASTA |
|
PRASTA |
CHAR |
67 |
5 |
0 |
T459S |
Period split |
EXSGT |
|
EXSGD |
CHAR |
72 |
1 |
0 |
|
Do not explode bulk material items |
BESAL |
|
BESAD |
CHAR |
73 |
1 |
0 |
|
Determination of explosion date for BOM and routing |
BSART |
|
BBSRT_NB |
CHAR |
74 |
4 |
0 |
T161 |
MRP:doc.type purchase requisitions for standard purchase ord |
BARTL |
|
BBSRT_LB |
CHAR |
78 |
4 |
0 |
T161 |
MRP: Document type purchase requisition for subcontracting |
BARTU |
|
BBSRT_UL |
CHAR |
82 |
4 |
0 |
T161 |
MRP: purchase requisition for stock transfer - document type |
GRREL |
|
GRREL |
CHAR |
86 |
1 |
0 |
|
Relevant for requirements grouping for project stock |
VERTR |
|
VERGR |
CHAR |
87 |
1 |
0 |
|
Start date of order proposals allowed in the past |
FKOBS |
|
FKOBS |
CHAR |
88 |
1 |
0 |
|
ATP check by full confirmation logic |
EVAPR |
|
MD_EVAPR |
CHAR |
89 |
3 |
0 |
T465 |
Evaluation Profile for Range-of-Coverage Data |