68684 | SOP: Pegged requirements display |
81683 | Transfer of key figure units to rough-cut planning |
74490 | Incorrect warehouse stock after period breakdown |
77712 | Capacity requirements are lost/swapped |
67580 | Capacity utilization is only partially calculated |
74628 | Rounding error during data backup |
71461 | Leading zeros of materials in the planning table |
83896 | Capacity reqs. incorrectly reduced or duplicated |
65170 | Change period division in planning table |
650807 | SOP: Changing period splitting not possible |
83350 | Hide capacity -> Incorrect key figure view |
88418 | Capacity reqs planning: no lot-size range change |
79404 | Multiple occupancy of available capacities |
18826 | SOP: T009B not fully maintained |
86183 | Capacity requirements from past periods |
72281 | No fiscal year variant with a period |
88480 | Cap. requirements planning: display error after job |
90663 | Capacity reqs planning: Unit unknown; distribution |
41634 | Preliminary Correction: SOP and Flexible Planning -> 3.0D |
82407 | Cap. rqmnts planning w. rough-cut planning profile |