838515 | CO02: You cannot return to variant transaction |
117120 | Search for PP-PI notes |
306639 | Incor.reqmt qty rounding co-products/by-products |
111816 | Incorrect results availability check |
658086 | Rounding requirements qty of components during order creatn |
311929 | Copying from order: Acct assignment to sales order |
681078 | Termination Message CO 097 during Order Creation |
151134 | Incor.results avail.check w/ alt. or discon. group |
382768 | Error in Note 377648 |
308461 | Rounding error in quantities of alternative items |
392684 | Note 360915 implemented in SP SAPKH46B25 incorrectly |
644772 | Error message 29090 during order creation |
496184 | CO01:progrm terminatn NOT_FOUND in Co_Bt_Caufv_Read_With_Key |
600645 | No rqmt qty for discontinuation components and alternatives |
206509 | Creating production order/process order with ref. |
451331 | Batch determination not possible after import of plug-in |
595217 | Control recipe creation performance |
418677 | Long text is not deleted when reading master data |
178939 | Transfer of co-products |
117321 | CO01,02: Rounding error for component quantities |
625774 | Dynpro sizing conflicts in production and process order |
109214 | Trmntion for availability check in collective order |
573153 | Error message KD082 when adding a co-product |
397695 | Temporary CUOBJ in table AFPO |
316244 | Storage locations deleted after phantom assembly inserted |
616987 | Issue storage location not taken from production version |
315865 | Note obsololete! Implement Note 354242 instead |
541861 | COHV: Reset availability data for assembly orders |
214941 | Note 209419 (table RSPSP f.prod.order) not complete |
308692 | Goods receipt indicator for non-valuated material |
198932 | ATP messages are missing in the release log |
643642 | No goods receipt for co-products |
368830 | Reading master data for co-products |
93714 | Cross-plant planning: Create batch |
393622 | Rounding error with component quantity change |
848144 | 'Recursiveness allowed' for input materials |
327016 | BCD_ZERODIVIDE for order processing |
655803 | Insert co-product: SBDKZ incorrect |
646372 | Source determination in the production and process order |
169794 | Material variant as a co-product |
314948 | Bill of material information in co-product item |
709062 | Error in goods movements for PP-processes with BOM 7 |
159014 | Batch is not copied to totals record |
187711 | Read master data does not read short text |
507248 | No credit generated during standard cost estimate |
520106 | Reduction of the data control blocks part 1 |
521432 | Reduction of the data control blocks part 5 |
213434 | Read master data doubles order long text |
136640 | Process order: Short text for recipe is missing |
139685 | Performance problems w/ orders w/o header material |
85896 | Confirmation sets up capacity requirements again |
520231 | Reduction of the data control blocks part 2 |
135010 | Error in Note 133306 for collective orders |
964608 | COR1: Incorrect conversion between order header units |
43594 | CO01: wrong ord.fin.date (in-hou. prod. time = 0) |
618805 | Supply area or LGORT determined wrongly if wrk centr changed |
437907 | Work center calendar not taken into account |
151824 | Error during auto.genratn w/ filter batch mgmt rqnt |
209419 | Table RSPSP only supplied for networks |
360915 | Assignment production order product cost collector |
133889 | Over-confirmation for batch split |
172215 | Transfer of 1st BOM line in PReq f. direct procurmt |
182099 | Including master recipe: incorrect operation |
660954 | Copying collective order with deletion flag |
159802 | Termination for batch split in alternative group |
594765 | Create with template:Account assgnmnt of co-prodcts incorrct |
551926 | Program termination ILLEGAL_OBJART in cost analysis |
514025 | Equivalence numbers are missing in settlement rule |
160209 | Manufacture of co-products: settlement rule |
519857 | Incorrect cost element in collective order |
437999 | Incorrect requirements date for manually inserted component |
189425 | CO350 in batch determination after split |
173664 | @3Z@Collective note: Lost char. value assignments |
439708 | Incorrect costing data during creation with reference |
211446 | Mfr.of co-prodcts: Settlmt rule f.non-valuated matl |
315082 | Short dump CALL_FUNCTION_NO. in CO_BC_RESB_VB_CHECK |
204000 | Process order: Operation release and log |
352327 | Process order: Changing functional area |
300800 | Modification: Order for a configurable material |
607089 | Valuated goods receipt for nonvaluated material |
80692 | Batch determination after withdrawal |
377648 | Incorrect requiremt quantity after header change in quantity |
130401 | Sub-operation/work element has incorrect dates |
150839 | Error in Note 149359 |
372819 | Order item is not transferred to X_BNCOM |
181328 | Header quty chnge in order network:unrounded quties |
521553 | Reduction of data control blocks part 6 |
328077 | CO630 and unnecessary settlement rule |
566814 | Planning file entry for MRP is not set |
84066 | Date fields for sub-operation/elements empty |
567360 | Planning file entry for MRP is not set |
327728 | No settlement rule after Read master data |
519373 | Various function groups are loaded unnecessarily |
206538 | CO01/08/R1: Configuration n copied fr sales order |
137331 | Process order: Batch determination after withdrawal |
426192 | Manufacture of co-products apportionment structure, cost di |
200176 | Display of checking group in the missing parts list |
355816 | Authoriztn check missing whn branching to transactn |
88877 | Availability check in the order without components |