41328 | LDB PSJ: Production order selection |
36731 | LDB PSJ: Error during authorization check |
36171 | LDB PSJ: Hierarchy level of subnetworks |
35647 | LDB PSJ: Missing components in versions |
358677 | CJ2B: Contents in table area differs from CN41 |
34634 | LDB PSJ: Performance improvements |
38342 | LDB PSJ: Selection of "incorrect" networks |
381231 | CJ2B:Durations+dates f. activits/activity elemnts |
136222 | Investment program view: Error OK036 |
391386 | CJ2B: Durations + dates for PSP elements/milestones |
41987 | LDB PSJ: Maintenance order selection |
41419 | Project Information System: F4 help for versions |
35961 | LDB PSJ: Missing data for activity elements |
61473 | LDB PSJ: Long runtimes with many orders |
42554 | LDB PSJ: Components in library networks |
160904 | Authorization check for costs,sales revenues,budget |
37303 | LDB PSJ:CONVERT_NO_NUMBER when reading relationship |
140842 | Error BS001 occurs when archivd activities are read |
152149 | LDB PSJ: Selection with dynamic selections |
96303 | Download/export MS-Access 7.0 (32-bit) up to 3.1G |
119790 | Missing WBS elements in investment program view |
106438 | Level of WBS elements with dynamic selections |
43991 | LDB PSJ: Missing relationships |
35174 | PIS: incorrect durations (actual, remaining, etc.) |
139298 | Download/export MS Access 32 bit and 16 bit |
45313 | Project Info System: Recognizing reservat. w. PReq |
411924 | PS information system: WBS elements are missing in hierarchy |
39263 | Missing information on costs in project versions |
48610 | LDB PSJ: Missing relationships (II) |
64318 | LDB PSJ: Performance during capacity selection |
40716 | Project Info System: time out during sel. w/o lvl 1 |
94198 | Error in availability control |
90534 | LDB PSJ: performance during confirmed activities |
131683 | PS-IS: Negative residual order plan |
43633 | Project Info System: calendar error in activity |
205178 | WBS elements are missing in project versions |
42859 | Proj. Info System: Detail screens: CONVT_NO_NUMBER |
142038 | Incorrect budget values in hierarchy report |
743562 | RCNCT000: regeneration of includes fails on unicode systems |
40360 | Project Info System: missing components (w/o PReq) |
118647 | ABAP/4 runtime error MESSAGE_TYPE_X in CN41 |
61462 | LDB PSJ: Status selection profile |
116158 | Performance when reading confirmations |
41068 | PIS: ASSIGN_LENGTH_0 with text item |
483771 | RCN_GEN_PSIS_STRUCTURES does not lead to regeneration |
102719 | Cost reporting w. selection version is not correct |
106823 | Overall pland csts in plang tabl, infosys str./dat. |
42069 | Project Info System: Call from mail does not work |
42483 | LDB PSJ: Sales documents for networks |
372944 | Incorrect identification after new field selection |
153668 | Inconsistent hierarchy in versions |
42909 | Project Information System: not confirmed=>no delay |
151819 | PS-IS:Residual order plan for several plan versions |
44335 | Project Information System: Error in key texts |
34439 | Project Information System: Incorr basic duration in network |
43411 | LDB PSJ: No data selection (SD documents) |
160926 | Project version:Incorrect costs/errors in selection |
49296 | LDB PSJ: Authorization for networks and orders |
147438 | Authorization when branching to hierarchy report |
42663 | PS versions: System error in program RCNVS000 |
43648 | Project Info System: negative user filters |
44799 | LDB PSJ: Error in hierarchy structure |
419383 | Moving columns with Drag&Drop incorrect |
44976 | LDB PSJ: Sorting top WBS elements |
153601 | PS-IS: Planned values of not appended orders |
46818 | Project Information System: (numeric) user filter |
41009 | Projects: Figure fields in detail screens |
70984 | LDB PSJ: Activities and status selection profile |
36346 | P.I.S.: Termination Perform_Confict_Type |
382633 | Deletion of projects/networks in time-dependent versions |
66561 | Project Info System: XXL: Missing field contents |
50325 | LDB PSJ: Authorization for networks and orders II |
41803 | Project Info Syst.:Graphic for drill-down by period |
43559 | Project Information System: Error in status filters |
64657 | Project information system: User filter for costs |
188725 | Column comparison not correct |
43010 | PIS: several user filters |
41598 | LDB CNJ: Quantity of goods received |
49393 | LDB PSJ: Project view summarization |
79737 | CJ45, CJ8G: Missing networks |
327606 | Go to the detail screen milestone for WBS element |
43762 | LDB PSJ: WBS hierarchy for alternative views |
127521 | PS IS: Unnecessary lines (Year 0000) |
131142 | Status of activities from operative data |
319410 | Includng customer-specific flds frm AUFK into AUFKR |
410400 | GET_PS_OBJECTNUMBER: Access problems with database DB2 |
134627 | VALLC: Full table scan although no subnetworks |
44136 | LDB PSJ: Runtime error TABLE_INVALID_INDEX |
80603 | PSJ: Missng/too many obj.when usng stat.sel.profile |
45016 | Versions in PS: Missing WBS elements |
152142 | Download/Export MS-Access 32 Bit and 16 Bit |
169336 | MPX download:Error message f.predecessor/successor |
401417 | CJ2B: Durations and dates for activities/activity elements |
41750 | LDB PSJ: Reservations, components |
107201 | Cost structure report: incorrect planned values |
204591 | PS Info system: Regeneration of the field strings |
37120 | Project Information System: Missing/wrong values |
118827 | Interface MS Access, setting the TCP/IP connection |
188663 | Enhancing selection views and dynamic selection |