SAP Program UMG_ADD_POST_STEP - Execute additional Preparation Steps

Purpose
The report UMG_ADD_POST_STEP provides a list of reports which must beexecuted right after the database import after the Unicode conversion.You can either run all reports in one step (a background job isscheduled) or you can run one single report in the dialog process. Eachreport can be executed as often as necessary. For each of the reports anote exists which is displayed at the beginning of the report log.
It is recommended to run all reports in background in a single step.

Features
After starting the report you see the main screen which is divided intothree parts:
In the top left corner there are several icons which are used for...
@15@...running a single report: mark a report in the tree and press the"Start Single Report" button. The selected report is executed in dialog.
@15@(Background) ...running all reports: A background job is scheduledand started (Name: UMG_PMIG_POST_JOB). The job executes all reports inthe list consecutively. The tree control is not updated automatically.Please use the refresh button to update the screen.
@42@...refreshing the tree control: Press the refresh button to updatethe display of the tree control in the lower left corner of the screen.
@38@... checking for missing reports. After pressing the check buttonyou get the list of reports which are not available in your system.
@01@...confirming warning messages: It might happen that a report writeswarning or error messages. Please check these messages by doubleclicking on the report in the tree control. What to do in case ofwarnings or errors: please read the note at the beginning of the log andif necessary open a service message. If the problem was fixed, you canmark the report in the tree a press the "Confirm" button. All warningand error message of the log are changed to info messages.
@M4@...displaying the status of background jobs: Transaction SM37 iscalled if you press the "Job" button. Here you can check the status ofthe background jobs started by UMG_ADD_POST_STEP.
@0S@... display this help.
The lower left corner of the screen consists of a tree showing the listof reports which should be executed. Different colors are used to showthe status of a report:
Initial, no color: The report has not been executed yet.
GREEN: The report has been executed at least one time. No warnings orerrors occurred during execution.
YELLOW: The report has been executed and there are warning messages orthe report is not available in your system. Please check the log of thereport for warning messages. If the report is not available please readthe note given in the log and try to create the report by a correctioninstruction or manually.
RED: The report has been executed and there are error messages.
Double click on a report name in the tree to display the log in theright part of the screen. Please note: a "Reset All" or "Restart SPUMG"in transaction SPUMG deletes also the report logs in UMG_ADD_POST_STEP.
The right part of the screen is used to display the log of a report.Please check the log for warning or error messages.

662215SPUMG and SUMG in Basis Release 6.20, 6.40 and 7.0X
1128672Report UMG_CHECK_STXL
1132495Report UMG_DELETE_SSLOAD
1128673Additional post conversion step UMG_ADJUST_I18N_SETTINGS
813445Documentation of the report UMG_POOL_TABLE
1128457Additional post conversion program UMG_SAVE_HISTORY