SAP Program RQPRSS10 - Create New Physical-Sample Drawing with Reference

Description
You can use this program to create a new physical-sample drawing withphysical samples for an inspection lot, an order, or a productionversion, and can process the new sample-drawing in order to release thephysical samples.
In addition, you can extend the results recording worklist to includethese new physical samples, by setting the indicator "Create inspectionpoints" on the initial screen.
If you do not enter an operation, an inspection point is created foreach operation in every new physical sample. If you select anoperation, inspection points are only created for this operation.

Precondition

  • No usage decision may be made for the inspection lot, which you either
  • chose directly as a reference, or found using the order number orproduction version.
    • The inspection lot supports the inspection of physical samples. This is
    • controlled using the inspection point type for the inspection pointthat you have maintained in the task list header.

      Output
      The program generates a configurable list of the physical samples thatwere created. You can prevent the list being displayed by setting theindicator "No log display" on the initial screen. In addition, thenumber of samples and the corresponding physical-sample drawing numberis also displayed in the list header. If you chose the test mode on theselection screen, this information also appears in the list header. Inthis case, the physical samples and the physical-sample drawing orinspection points for results recording are not created.
      The list contains the following functions:

      • Processing the physical-sample drawing to release the physical samples
      • created.