Time Leveling Use This report creates a list of employees for time leveling. You can usethe time leveling> report to compare employees actual workingtimes to the times documented for them in the form of time or incentivewage data. You can then make corrections or new entries so that the timedata corresponds to the actual time worked. You can monitor, forexample:
- Which time data is documented with special times
- If employees have completed their planned working hours
- Whether there are sufficient time tickets for employees who work on an
incentive wage basis. If you select the Display Difference> field, thedifferences between the documented time and the planned time arehighlighted in the list by means of different colors and descriptions inthe tooltip text. The corresponding colors and descriptions areexplained in the legend. Determining the comparison times>
- Determining the daily working time
In time leveling>, the term working time> refers to actualworking time, as opposed to planned working time in infotype 0007. An employees daily working time is determined according to whetheractual times are recorded and evaluated (Time Management status in thePlanned Working Time infotype (0007). Scenario 1: No recording of actual times (Time Management status fieldhas a value of 0 or 9). The working time is determined from theemployees personal work schedule. Absences from infotype 2001 reduce theworking time, and overtime from infotype 2005 increase the working time. Scenario 2: Recording of actual times (Time Management status field hasa value between 1 and 8). The working time is calculated from the results of time evaluation(report RPTIME00). The time type flagged as productive time can bespecified as a parameter for the report (for example, time transfers canbe included in the cumulation of working time via this time type). For absences of more than one day, the working time is reduced each dayby the time specified in the work schedule. For overtime over more thanone day, the number of hours specified in the overtime record is addedin equal proportions to the working time of the individual days.
|