Purpose Prerequisites Activities Creating Wage Notifications
Processing With the B2A Manager You can use the Use the If all recipients are to be supplied using EIV, choose the follow-onstatus With the EIV procedure, you download the signed instance document andmanually supply the final recipient (for example, upload or post).Select the entry again and choose the As soon as the wage notification is created, the status changesaccordingly. You can then download the wage notification by selectingthe entry, choosing the You then have the option of manually changing the status to document theprogress of the manual activities. If recipients are to be supplied using a distributor via PIV, choose thefollow-on status Note: For this variant it is possible to download a copy of the wagenotification sent to the distributor in case some of the finalrecipients need to be supplied via EIV. Select the entry again and choose the After sending successfully, the system directly queries the processingstatus at the distributor. If required, change the status and choose the"Execute" pushbutton to query the status at regular intervals until thenotification is either accepted or rejected. If this is successful, the process reaches the status "Compl. <(>&<)>Release". By selecting and executing, the screen with therequired information for completion and release appears: If you select the icons in the notifications column, you see therecipient's notifications in detail. Double-clicking on the link opens a browser with previously filledaccess data for completing and releasing the notification at the finalrecipient. If this does not work, you can also show the column with akey and password on the UI and manually copy and insert the URL, key,and password. On leaving, the system asks you whether the completion was successfuland automatically sets a suitable follow-on status. Note: You can also see the completion and release information forcompleted releases using the process data display. Notes on Fulfilling the Obligation for Retaining Information |
1548508 | ELM: "End date" earlier than "Start date" |
1542496 | ELM: Error 'TransformerException' during processing in PI |
1537130 | ELM: AHV/UI-exempt wages missing for several company codes |
1450651 | ELM/BFS: Documntatn for data elemnts and report RPLBGAC1_ELM |
1440053 | ELM: Excluding personnel numbers for individual domains |
1443717 | ELM: Incorrect leaving date after change of legal person |
1285833 | ELM: Err for WHT liability 1 if place of residence is abroad |
1431412 | ELM: Totals duplicated in XML if many PY units per recipient |
1431704 | ELM: Wage statement/tax for pensioners cannot be reported |
1427430 | ELM: Incorrect content in <Certificate> for status query |
1399654 | ELM: Layout for display of completion data missing |
1397958 | Customizing activities for ELM, statistics area |
1260657 | Delivery Uniform Wage Notification Procedure (ELM) |
1357184 | ELM: IMG doc. adjusted due to possible use in prod. system |
1309527 | ELM: Invalid nationality in XML for stateless employees |
1313006 | ELM/BFS: Cumulation wage types with number (hours/lessons) |
1285589 | ELM: runtime error in data extractor during background proc. |
1279016 | ELM: Insurance ID or response ID in lower case |