Description This report creates a list for wage compensation (LAG) for employees ofcompanies within the construction industry in Germany. It can only be run after the payroll run for November and before thestart of the payroll run for December (in other words, for period 12). In addition to a list, a batch input session can also be generated forinfotype 0215 (Construction Industry Transaction Data). With this batch input session, you store the values for the averagegross hourly wage (BSL) and the wage compensation hours that aregenerated by the report. The BSL is only entered once per month,however,the lost hours are entered for each wage compensation day. Thehours are valuated with the BSl in payroll with calculation ruleDBLZ>. The wagetypes used for this are flagged accordingly in Customizing (processingclass 79: 'F': BSL (reduced), 'G': LAG hours). As well as the modelwage types BL60 and BL70, only one customer wage type can be coded inthis way.Parameter In addition to parameters that are already used in Payroll (payrollperiod and personnel number selection), the selection screen alsorequires input of the social fund for the construction industry forwhich the LAG calculation is performed in this run and which alsosupports the payment of LAG amounts. In the additional options, you can specify whether
- The LAG amounts for December and January are printed separately or in
one total
- Additional control values for the calculation of the entitlement or
amounts are printed (the control values can also be printed in the listwith option by selecting lines)
- A batch input session with the calculated BSL and hours for infotype
0215 (Construction Industry Transaction Data) is created. If delimitations are set, you can decide whether
|