Purpose This report calculates delay times for sales order or sales order itemson a multilevel basis and makes the results available to the Business Package for the Production Supervisor for ERP 2007>. Information on the calculation of the multilevel delay is available inthe documentation on the order report for materialrequirements planning>. SAP recommends scheduling the report as a regularly running job. Thereport can be scheduled using transaction MDML>.Prerequisites
|