Description General Function Description
This program allows you to enter a time by which the program is to befinished. If you are planning to run the program for the weekend, forexample, the program can be finished on Monday morning before startingproductive operation (if it has not finished on time). To prevent shipment documents from being changed during therestructuring, you can block them. If an incorrect shipment document is processed during the restructuringprocess, a corresponding entry is created in the log with the documentnumber and the reason for the error. The statistics data for thisdocument is not updated. You can specify the maximum number oftolerated errors. If you wish to check the correctness of the restructuring, you canevaluate the first version using the standard analysis before you copythe data (with report RMCSISCP) into the actual version 000. Precondition |