SAP Program RJHSTAT6 - IS-M/AM: Status/Characteristic Attributes for Distribution Schd.Lines

Title
Evaluation of Status in Distribution Items

Purpose
This function allows you to determine schedule lines in distributionitems using the schedule line status and display these in a list. Youwant to determine all distribution items for which shipping has alreadybeen started.

Selection
The following selection criteria are available to you on the selectionscreen:

  • Header data

  • Schedule line data with status levels and status characteristics

  • The system preassigns the selection criteria as follows:
    • Period

    • The system preassigns the start and end date of the selection period.The start date is today’s date. The system preassigns the end date as31.12.9999. You can change the start and end date.
      • Not relevant for selection

      • The system selects this indicator for all status characteristics. Ifyou retain this indicator, status characteristics are not taken intoaccount during selection. If you deselect this indicator, statuscharacteristics are taken into account as follows during selection:
        If you deselect the indicator and do not select the associated statuscharacteristic, the system displays all schedule lines for which thestatus characteristic has not been selected.
        If you deselect the indicator and select the associated statuscharacteristic, the system displays all schedule lines for which thestatus characteristic has been selected.
        You can use the layout and print options to control how the list isdisplayed.

        Output
        The system displays schedule lines that match the selection criteria ina list on the display screen. The list is sorted in ascending order bysales document, item, sub-item, and schedule line number. You canhowever use the Sort and List variant functions to sortthis differently. Standard ABAP List Viewer functions are available toyou for editing the list. These include the following:

        • Display details

        • Access a dialog box from the list and display details of the selectedschedule line.
          • Change schedule lines

          • Access the schedule line overview screen from the list and change theschedule line data.