SAP Program RJBRFSZ - Report for Converting Old Due Date Scenarios

Description
The due date scenarios have been enhanced, so that you can now definedue dates as absolute points in time. This and other enhancements inthe functions and definitions of due date scenarios make this reportnecessary, as it converts the due dates already defined.
Procedure: The defintion of the due date scenario is transferred. Theficticious flows are saved as a period block under the name . The ficticious changes are defined in the headerinformation of the due date scenario as 1 times the period block.
In customizing you must manually post-maintain the short and extendeddescriptions of the period blocks. These are only used fordocumentation purposes.

Precondition
If the report is cancelled during upgrading, you can restart itmanually at any time (RJBRFSZ).

Example
DS positions: MANDT ABLAUFFIKT FIKTCFNR STEPS ZEITEINH ABLAUFREL
300 FUS 100 01 02 10,00
300 FUS 200 01 02 20,00
300 FUS 300 01 03 20,00
Results in:
Header info: MANDT ABLAUFFIKT SZNBEGINN SZNENDE SOCKEL ABSKENNZ
300 FUS 00000000 00000000 0,0
Setting, relat.: MANDT ABLAUFFIKT FIKTCFNR PERIODENBLOCK ANZAHL
300 FUS 100 FUS1 1
Period block definition: MANDT PERIODENBLOCK
300 FUS1
PB settings: MANDT PERIODENBLOCK FIKTCFNR STEPS ZEITEINH ABLAUFREL
300 FUS1 100 01 02 10,00
300 FUS1 200 01 02 20,00
300 FUS1 300 01 03 20,00