Title Adjusting the costing rule to control how the system displays the NPVand distributes one-off charges and commission to periods. Purpose XPRA adjusts the costing rule as follows:
- For loans and fixed-term deposits, the value of the new control field
SBEGEPBW is set to '0'. This field is used to calculate the NPV of allcharges and commission that are due within a fixed interest rateperiod.
- For loans and fixed-term deposits, the value of the new control field
SBEGEPBE is set to '0'. This field is used to calculate the total ofthe charges and commission that are due within the fixed-interestperiod.Features
|