SAP Program RHXINLV1_LSO - Internal Activity Allocation for Instructor Function

Description
This report lets you carry out internal activity allocation of coursesbetween the organizer and the instructor by means of credit and debitmemos. During this process, the cost center of the cost object(receiving cost center) is debited and the instructor's (sender) costcenter is credited.
In addition, you can cancel documents for instructor functions alreadyallocated and, if instructor costs have not yet been allocated, you canchange activity price data.

Integration
You activate integration with Cost Accounting (CO) for activityallocation purposes in Customizing for Training and Event Managementunder Internal Activity Allocation.

Preconditions

  • The cost items must be maintained for the resource type 'instructor'

  • The instructor's cost center assignment must be maintained.

  • The account assignment object (cost center/order/PSP element) must be
  • maintained.
    • The sender cost center must be maintained.

    • The sender cost center and the account assignment object must be in the
    • same controlling area.
      • The activity type must be maintained.

      • Note
        To be able to use the internal activity allocation functions, you mustfirst create a network of activities. You must define plannedactivities and prices and the relevant activity types for the costcenters involved in the allocation process. For Training and EventManagement purposes, however, it is sufficient to plan the activityprice of the sender cost center together with the activity type set inCustomizing in the step Specify Activity Types
        .
        The following points regarding activity typeare important:
        ACTIVITY CATEGORY = 1 (manual entry andallocation) with the corresponding cost element (see point 2)
        COST ELEMENT= secondary (internal allocationscreated by you, the customer)
        COST ELEMENT CATEGORY = 43 (internalactivity allocation)
        Planning activities/activity prices
        PRICE = 1

        Features

        Selection
        You can set parameters to determine the data output by the report:
        Course selection
        There are a number of ways to start the report:
        Enter one or more course groups. The system finds all of thecourses belonging to the specified group(s) and lists the instructors.
        Enter one or more course types. The system finds all of thecourses and instructors belonging to the specified type(s).
        Enter one or more courses whose instructor costs are to beallocated.
        You specify the instructor(s) by selecting the object type andentering the name(s). The system offers you all object types to whichindividual persons can be assigned for selection.
        Reporting period
        Enter the exact period for which you want to determine instructors forallocation.
        List output
        You can specify whether the report should output instructors that arenot yet allocated, already allocated or can beallocated for the events specified.
        Document date
        Enter a date in this field if you want to change the default date ofthe activity allocation. This date is used purely for informationpurposes. The default date is usually the current date.
        Posting date
        The date in this field indicates when costs are to be posted to CO, inother words, the settlement period. The default date is usually thecourse start date. You can overwrite this date as required.
        Example
        You want to perform activity allocation for the instructor of a coursethat started on February 2 of this year. However, you want costsallocated in the second quarter rather than in the first quarter. Inthis case, you enter April 2 of this year as the posting date.
        Standard selection screen
        If you select this indicator and choose Execute, you access themore detailed selection screen of the main report RHINLV10 before thereport is run.
        Note
        On the selection screen of the main report you can search for objectsby 'status', for example. As a rule, it is not necessary to go to themain report since the selection screen of the pre-report offerssufficient selection options. If you do not want to access the detailedselection screen, do not activate this option before choosingExecute.

        Output
        The report outputs a list containing the following information percourse:

        • Course:

        • Instructor

        • Resource type

        • Sender cost center

        • Activity type

        • Activity allocation price

        • Account assignment object(s) (for example, receiving cost center)

        • Document number

        • You can perform activity allocation from the list screen.
          If you select the instructors for activity allocation and chooseCreate activity allocation, all activity allocation data istransferred to CO.
          The following process flow takes place:
          A validation check is performed on the document items.
          If the items are validated, a reference document is generated with thestatus transfer designated.
          The BAPI/ALE for the activity allocation is called.
          The status of the reference document changes to transfer effected (yellow/amber light).
          Due to the fact that the systems may be decoupled (CO and PE indistributed systems), confirmation of this transaction is necessary toensure that the transaction has actually been executed.
          For this purpose, you must call the function Compare document.The system searches for the original CO document.
          If it finds the original document, the status of the reference documentchanges to Transfer confirmed (green light).
          You can display the original document by choosing View ->Ref. <-> Original document.
          If the original document cannot be found, the status of the referencedocument changes to Transfer incorrect (red light).
          For more information on the procedure when the original document cannotbe found, refer to Error diagnosis.
          You can execute the following functions from the list screen:
          • Display the document flow for course, in other words, all of the
          • relevant allocation data that exists for the course. (The cursor mustbe positioned on the course.)
            • Display the document flow for the instructor, in other words,
            • all of the relevant allocation data that exists for the instructor.(The cursor must be positioned on the instructor.)
              • Display document (reference document)

              • Display error log (confirmations of check/execution of activity
              • allocation)
                • Check whether the relevant data can be allocated. This function
                • also checks whether the settlement period is closed, in which case,data transfer to CO is not allowed.
                  • Cancel document: If activity allocation was incorrect, you can
                  • cancel the CO document and execute the function again. This process isequivalent to generating a new document.
                    • Change the price for not yet allocated instructors.
                    • Note
                      If you are perfoming activity allocation in distributed systems (HR undCO in different systems), please note the information contained inSet Activity Allocation for Training and EventManagement.