Purpose The report selects contracts and their objects along with theirmeasurements. Selection The report determines the contracts using the following parameters:
- Contract term
- Length of time an object is assigned to the contract
- Validity of the measurement within this time period
Output For each validity period of a row, you can see, based on the trafficlight, if the object is occupied, partially occupied, or available inthis period.
|