trados = docu -> fi -> ficaPurpose You can use this program if you want to schedule and monitor massactivities, such as the payment run (transaction FPY1>) or yourown reports with the Schedule Manager>. This program creates and starts a new mass activity run. The copytemplate entered is used. If event 1906 is not implemented, the date IDand identification are determined as follows:
- The date ID is set to the current date.
- The old identification is used.
If there is already a run with this date ID and identification, a numberis added to the first 3 characters of the old identification. If thisidentification also exists already, the number is increased. If a mass activity uses the function Move Run Data by N Days>(Ctrl+F6), the date fields are adjusted in the parameter record. Thesystem thereby determines the days difference from the run date of thesource record and the run date of the target record (for example,Posting> Date> field in payment run).Example From the old identification TEST, the new identification TES01 iscreated. Features Once the run has started, the program monitors all parallel jobsstarted. The program runs until all jobs have been completed. This canlead to long runtimes. You should therefore only run the program in thebackground. If you want to use an alternative name for the new parameter records, orcopy with other options, use event 1906. You can use function moduleFKK_PARAMETER_COPY> to copy. The status of this program in the Schedule Manager> is determinedas follows:
- If an error occurs before you schedule the mass activity, for example,
when you create the copy template, the status of the program is set toProcessing terminated with errors>.
- If one or more jobs of the mass activity terminate, the status of the
program is also set to Processing terminated with errors>.
- If all jobs in the mass activity are completed without termination, the
program analyzes the messages that occurred in the mass activity. If a termination message was issued in the mass activity, the status ofthe program is also set to Processing terminated with errors>. If an error message was issued in the mass activity, the status of theprogram is set to Processing ended with warnings>, since theprogram cannot assess how serious an error message is for the programlogic. However, if you also want the program to end with the statusProcessing terminated with errors> in this situation, set theparameter Status for error messages> on the selection screen toE>.
|