Purpose With this report program you can create an overview of the exposuresituation for one or more persons> for a selected time period. Youcan also determine for one or morework areas> the agents towhich the persons are exposed, which were assigned to these work areasin the selected period. The program selects from the following person groups:
- Persons that have the role of test person> in a
measurement project. Test persons can beemployees>,applicants>, orexternal persons>.
- Persons that are stored as
employees> and are assignedto a work area of a measurement project via a link in the componentOrganizational Management> (PA-OS) For employees, you can also display the attendance hours in the selectedtime period.Prerequisites
- The required system settings must exist in Customizing for
Industrial Hygiene and Safety> under SpecifyMeasurement Items>.
- In the selection period, valid links between the persons and the
relevant work areas must exist in the Organizational Management>(PA-OS) component. The system checks this using the evaluation paths setin Customizing for Basic Data and Tools> in the environmentparameters WA_PATHID> andP_PATHID>. In the standard system, thefollowing default evaluation paths are set: WA_PATHID: WA-S-P (work area -> positions -> persons>) P_PATHID: P-WA-S (persons -> work area -> positions>) Note:> When determining the attendance hours, the system evaluates the infotype2002 (attendances>) from Time Management> (PT). Theattendance hours are calculated to the exact day.Selection On the selection screen you can restrict the search using the followingcriteria:
- Person or work area
You must specify at least a person or a work area. Under Work Area > you can also set the IncludeHigher-Level Work Area> or IncludeLower-Level Work Area> indicators.
- Period (such as key date, month, or time interval)
You can enter time periods of up to 365 days in length.
|