Description You can select installations according to multiple criteria, and thensimulate mass billing runs of these installations. The selectionconditions are AND operations, meaning you can restrict the selectedinstallation intervals with additional selection criteria. Precondition All selected installations must be billable. Output Billing documents are created. Example If you enter the installation interval 1 to 100, the portion 001, andthe scheduled billing date 01/01/2000, all installations between 1 and100 from portion 001 are billed whose scheduled billing date fallsbefore 01/01/2000. |