SAP Program RCS00160 - BOM Changes for a Change Number

Description
This program creates a list containing all the BOM changes for a changenumber.

Output
The header or item record is duplicated for every change with history.The list contains several display blocks with the followinginformation:

  • Block identifying the BOM (obligatory):

  • Alternative, (for example, material), description,plant
    This block is generated for every change.
    • Block for changed header record (optional):

    • quantity, unit of measure, description, created by
      • Block for changed item record (optional):

      • item number, component, item type, quantity, unit of measure,description
        Column "AEN"
        The display blocks for the changed header or item records begin withthe column AEN. The information contained in this column isexplained below.
        Active header or item records:
        • New

        • The header or item record is created.
          This happens when an existing header or item is created or changed withreference to a change number.
          • Old

          • The header or item record is changed.
            This can happen when an existing header or item is changed withreference to a change number (there is a successor).
            Logically deleted header or item records:
            • Del

            • This happens when an existing header or item is deleted with referenceto a change number (there is no succesor).
              Inactive item records (see examples):
              • Inn und Ind

              • The item valid-from date is greater than or equal to the valid-to date(for example, due to a date shift).
                Inn
                The item starts with the change number.
                Ind
                The item ends with the change number.
                • Ina

                • The item valid-from date is equal to the valid-to date.
                  The item was created and deleted with the same change number.

                  Example 1
                  An item is created with change number N1, for example. It is thendeleted with the change number N2, for example. The same valid-fromdate is used for both change numbers.

                  • Reporting for N1

                  • before deletion: New
                    after deletion: Inn
                    • Reporting for N2

                    • after deletion: Ind

                      Example 2 (date shift)
                      An item is created with a change number N1, for example. It is thendeleted with the change number N2, for example. Different valid-fromdates are used for the two change numbers.
                      The date can be shifted as follows:

                      • N1 date shifted to after N2 date

                      • N2 date shifted to before N1 date

                      • Reporting
                        • Reporting for N1

                        • before the shift: New
                          after the shift: Inn
                          • REporting for N2

                          • before the shift: Del
                            after the shift: Ind

747469Conversion to SAP List Viewer - ERP Operations ECC 5.00