Purpose Determining EH&S key figures:
- Number of risk assessments for defined criteria
- Number of new risk assessments
- Number of overdue risk assessments
Depending on the parameter settings in the Risk Assessment Data>group box, this report determines one of the EH&S key figures mentionedabove. For more information about using selection parameters, see theSelection> section. If the report is called in the background (batch mode), only the keyfigure value is determined, detailed information is not formatted. If the report is not> called in the background, it provides a listof the risk assessments that were determined using the selectionparameters that you specified.Prerequisites Authorization Check> Missing authorizations can mean that the key figure cannot bedetermined, or that only the determined key figure is output. In thiscase, no detailed data is output. If you restrict the specifiedselection criteria such that only data for which you have authorizationis determined, the key figure is correctly determined and the detaileddata is output in the results table. An exception to the authorizationcheck is the HR master data check. If no personal data may be read,those fields remain blank. Authorization Objects> The following authorization objects are required to determine this keyfigure in the key-figure-determining EHS system:
- P_ORGIN ,,,,(HR: Master Data)
- PLOG ,,,,(Personnel Planning)
- P_APPL ,,,,(HR: Applicants)
- C_EHSI_WAH ,,(EHS: Work Area Header)
- C_EHSB_STA ,,(EHS: Status of Objects)
- C_EHSI_HAZ ,,(EHS: Agent Type)
Features Results List> The results list outputs the following information for the determinedrisk assessments:
- Agent
- Desc. of agent (name of agent)
- Agent type (name of agent type)
- Main rating (name of main rating)
- Result (of risk assessment)
- Reason for assessment (name of reason for risk assessment)
- Remark
- Value assignment icon
- Status (name of risk assessment status)
- Initial status (name of initial status)
- Next risk assessmt (next risk assessment)
- Risk assmt overd. (overdue risk assessment)
- Severity (description of risk severity)
- Probability (description of risk probability)
- Rating After Check
- Rating After Check Icon
- Date of Rating (date of final rating of risk)
- Plant (assigned plant)
- Name (of plant)
- Work area (assigned work area)
- Name (name of assigned work area)
- Work Area Type (name of type of work area)
- Operation status (name of operation status)
- Personnel number for person responsible (personnel number of person
responsible)
- Personnel group of person responsible (name of personnel group of person
responsible)
- First name of person responsible (first name of person responsible for
risk assessment)
- Last name of person responsible (last name of person responsible for
risk assessment)
|