Purpose The report assigns the available stock/provisions of a force element(taking planned receipts/issues into consideration) to arelocation/relocation step and also creates the required assignments ofthe provisions packages (PPAs)/material planning objects (MPOs) tothe relocation and to the relocation step. Prerequisites Only relocation steps of type 2 or 3 can be selected. Output The report creates a list of current stock (and planned stock). The materials to be planned can then be selected. |