SAP Program RQSTA005 - Graphical Scheduling Overview (Stability Study)

Purpose
You can use this report to display the graphical scheduling overview oftesting schedules for one or more stability studies.
For the selected testing schedule items all dates in your selectionperiod are displayed graphically according to their processing status.

Integration
This evaluation was based on the graphical scheduling overview formaintenance plans (transaction IP19).

Features
Restrictive criteria are available for the selection of maintenanceplans. The result of the selection is a graphical scheduling overviewthat corresponds to the selection criteria and displays the call dates(according to their status and using a symbol) for all selected testingschedule items (with or without the output of the associated testingschedule).
The selected testing schedule item is output in the graphic with thenumber of the item and the short text.
You can see the meaning of the graphical symbol for the call date inthe legend for the graphic.
In this graphic, you can sort the output of the testing schedule itemsaccording to:

  • Planned date (total)

  • Planned date (waiting)

  • The key of the testing schedule

  • The testing schedule item number
  • Activities