SAP Program RNHCO006 - IS-HCO: Base Planning Object for Case-Based Orders

Description
In the standard SAP CO component, you can define cost estimates for IS-Hservices using base object costings. If you enter a service for a casein IS-H that has a base object costing in CO, this program allows you totransfer this base object costing into the order of the case.
If a case has several services for which a base object costing exists,the system adds the relevant base object costings to the case-basedorder.
If you run the program in test mode, it shows you which costobject-based service it would transfer to which case-based order inproduction mode.
Note that changes to the services of a case do not automatically resultin the case-based order being changed (with regard to the base objectcosting). The changes only take effect the next time the program isexecuted.

Precondition
To transfer base object costings into case-based orders, the followingrequirements must be satisfied both in CO and IS-H:

Requirements in CO

  • The base object costing you wish to transfer must exist in CO. For this
  • purpose, use the base object costing and simulation costing functions ofCO.
    • The corresponding case-based orders in CO must exist for the cases to be
    • processed. You create the case-based orders in IS-H. Depending on howyour system is configured, this is done either manually when theadmission is saved, or on demand periodically by means of the HCO:Create Orders program.

      Requirements in IS-H

      • The service for which you wish to transfer the base object costing into
      • the case-based order must be flagged as a cost object in the servicemaster.
        • You have stipulated in Customizing for IS-H that you are using
        • case-based orders.
          • In the system settings for IS-HCO, you must assign the IS-H service to
          • the base object costing in CO.
            • You must maintain the configuration for the event HCO009 (Change Order
            • Planning).

              Output
              The program takes into account all cases that satisfy your selectioncriteria and the requirements as described above.
              The program outputs a list of the cases for which cost object-basedservices exist, but whose base object costing has not yet beentransferred into the corresponding case-based orders. The list alsoshows which base object costing is transferred for which costobject-based service into which case-based order.
              If a case does not have any services, to which a base planning object isassigned, the program simply deletes any base object costing thatexists. Even if there are no base object costings, a corresponding entryappears in the output list.