SAP Program RJBDXP28 - XPRA Program: Initialize New Fields in Costing Rule

Title
Adjusting the costing rule to control how the system displays the NPVand distributes one-off charges and commission to periods.

Purpose
XPRA adjusts the costing rule as follows:

  • For loans and fixed-term deposits, the value of the new control field
  • SBEGEPBW is set to '0'. This field is used to calculate the NPV of allcharges and commission that are due within a fixed interest rateperiod.
    • For loans and fixed-term deposits, the value of the new control field
    • SBEGEPBE is set to '0'. This field is used to calculate the total ofthe charges and commission that are due within the fixed-interestperiod.

      Features