SAP Program RCC00200 - Change Numbers for a BOM

Description
When you copy a material, you see the material number and descriptioninthe header list.
The list contains the following information for each line:

  • indicator showing whether changes have been made to the BOM with the
  • change number
    • change number

    • valid-from date from the change number

    • change number text

    • revision level of material and change number

747469Conversion to SAP List Viewer - ERP Operations ECC 5.00